Abraj Al AzlContracting
Call العربية
Engineer in a hard hat and high-visibility vest inspecting the facade and roof edge of a new villa

Villa pre-handover inspection in Ishbiliya

Inspect before you sign

Full inspection of new villas before handover, covering finishes, plumbing, the roof, electrical points and AC

+966 54 311 2066
The service in your area

Villa pre-handover inspection in Ishbiliya

Villa pre-handover inspection in Ishbiliya starts when you send photos of the villa by WhatsApp or phone. The district has new residential villas, and each one must be checked carefully before you sign for it.

Villas in Ishbiliya sit on separate plots with modern designs and need careful checking of roofs, walls, electrics, plumbing and air conditioning. Interior and exterior finishes may have paint or fitting defects, and pipes may leak from joints or under floors. Clear photos of the villa from all angles help spot problems before you move in. A thorough inspection reduces the shock of discovering defects right after handover.

  • Ishbiliya is a district in the Eastern Province near Al Jisr and Al Khawr, with relatively new residential villas and apartment buildings.
  • New villas in newer residential areas may have finish defects or water leaks that need checking before handover.
What the service includes

The scope of the work in Ishbiliya

  • Handing over a written list of findings with the location of each one
  • Inspecting the roof, the waterproof layer, the parapet and the drain openings
  • Running taps, examining drain openings and testing WCs
  • Checking finishes including paint, tiles, ceilings and walls
How we work

From first contact to the finished job in Ishbiliya

1

Send photos and get in touch

On WhatsApp: photos of the villa or any spot that concerns you, and let us know if a handover date has been set so we can arrange things with you.

2

Check finishes and closures

Walls, ceilings and floors are checked for cracks, voids and stains, and doors and windows are opened and closed to check frames, locks and gaps.

3

Check plumbing, electrical and AC

Taps and WCs are run, electrical points are tested, AC bases and condensate drain outlets are checked, and floor drains in the kitchen and bathrooms are examined.

4

Check the roof and waterproofing

The roof is checked for ponding, the condition of the waterproof layer, the parapet seal, AC bases and drain openings, as these are the points where finish shortfalls show up most.

What sets us apart

Why Abraj Al Azl?

Faults found earlyA fault in the plumbing or the waterproofing grows after you move in; finding it at handover stage limits the damage.

Your request from Ishbiliya comes to usCall or WhatsApp on one number, and we answer you ourselves.

We serve Ishbiliya and around itIncluding Al Jisr, Al Khawr and At Tahliyah, as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Empty seaside pool during waterproofing
Mosaic-tiled seaside pool
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
Pool at night with water jets after waterproofing
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on villa pre-handover inspection in Ishbiliya

How many photos do I need to send to inspect my villa in Ishbiliya?

Send clear photos of each room, the roof, bathrooms, kitchen, pipes and electrical connections. Photos from inside and out help us understand the villa's full condition, and the more detail the photos show the more thorough the inspection can be.

Do you check air conditioning and roofs in pre-handover inspection?

Yes, air conditioning and the roof are key areas. We check connections and leaks around units and cracks or voids in the roof through photos. Any problems in these areas should be fixed before you take the villa.

What do I do with the findings list you give me?

The list describes each finding and where it is in the villa, so you can hand it to the contractor and ask for each point to be fixed before handover or as a condition of it. We make no claim of legal weight for the list, but it is clear documentation that gives you a basis for the conversation.

What decides the cost of a villa inspection?

The cost depends on the size of the villa, the number of floors, the number of rooms and bathrooms, how accessible the roof is, the condition of the finishes, and whether there are any areas that need particular attention. Send us photos and details of the villa on WhatsApp and we will give you the specifics.

What does a pre-handover villa inspection cover?

The inspection covers internal and external finishes including paint, tiles and ceilings, doors and windows with their frames, plumbing and sanitary points, electrical sockets and switches, AC bases and condensate drain outlets, and the roof with its waterproof layer, parapet and drain openings. It ends with a written list of findings.

Is Ishbiliya within your service area?

Yes, Ishbiliya is one of the areas we work in, as are Al Jisr, Al Khawr and At Tahliyah. To start, call us or message us on WhatsApp.

Nearby areas

We also offer it in neighbouring areas

We also work near Ishbiliya, in Al Jisr, Al Khawr and At Tahliyah.

Other services in the area

More services in Ishbiliya

White insulated dome on a roof among the houses

In Ishbiliya and need villa pre-handover inspection?
Send us photos of the spot

Call us or send photos of the villa on WhatsApp before the handover date, and we take it from there.

+966 54 311 2066
Call nowWhatsApp