Abraj Al AzlContracting
Call العربية
Engineer in a hard hat and high-visibility vest inspecting the facade and roof edge of a new villa

Villa pre-handover inspection in Ash Sheraa

Inspect before you sign

Full inspection of new villas before handover, covering finishes, plumbing, the roof, electrical points and AC

+966 54 311 2066
The service in your area

Villa pre-handover inspection in Ash Sheraa

We provide pre-handover villa inspection in Ash Sheraa, working from photos you send by call or WhatsApp. We review the villa before it is delivered and show what needs correcting before you accept it.

Ash Sheraa is a residential district with villas ranging from very new builds to older ones, and Ar Raja and Al Amwaj lie close by. At handover the roof deserves attention because it is exposed to sun and heat, the plumbing because its joints are hidden inside walls, then electrics and AC. The photos decide what needs direct inspection on site.

  • Ash Sheraa is a residential district in the Eastern Province, with Ar Raja, Al Amwaj and As Sawari close by.
  • Exposed villa roofs take the full force of sun and heat, so their layers need careful review at handover.
What the service includes

What we do for you in Ash Sheraa

  • Checking finishes including paint, tiles, ceilings and walls
  • Handing over a written list of findings with the location of each one
  • Inspecting the roof, the waterproof layer, the parapet and the drain openings
  • Checking electrical points, AC bases and condensate drain outlets
How we work

From first contact to the finished job in Ash Sheraa

1

Send photos and get in touch

On WhatsApp: photos of the villa or any spot that concerns you, and let us know if a handover date has been set so we can arrange things with you.

2

Check finishes and closures

Walls, ceilings and floors are checked for cracks, voids and stains, and doors and windows are opened and closed to check frames, locks and gaps.

3

Check plumbing, electrical and AC

Taps and WCs are run, electrical points are tested, AC bases and condensate drain outlets are checked, and floor drains in the kitchen and bathrooms are examined.

4

Check the roof and waterproofing

The roof is checked for ponding, the condition of the waterproof layer, the parapet seal, AC bases and drain openings, as these are the points where finish shortfalls show up most.

What sets us apart

Why Abraj Al Azl?

A list in your hand before you signWritten findings give you a clear basis to ask the contractor for repairs before the formal handover.

Start from Ash Sheraa with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Your request from Ash Sheraa comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Empty seaside pool during waterproofing
Mosaic-tiled seaside pool
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
Pool at night with water jets after waterproofing
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about villa pre-handover inspection in Ash Sheraa

Can a villa in Ash Sheraa be checked before furniture is moved in?

Yes, that is the best time. Photos taken before furniture arrives show walls, floors and the roof clearly, so defects are easier to pin down before belongings cover them.

What happens if we find a defect in the villa at handover?

We record the defect with photos and explain its nature and extent, so you can report it to the contractor before signing. The decision stays with you once you have the full picture.

What should I bring or prepare before the inspection?

Bring the villa plan if you have it and any notes you have already sent the contractor. Make sure water and electricity are active in the villa on the day so we can run the taps, test the electrical points and check the AC units. Send us photos of any spot that concerns you beforehand.

What do I do with the findings list you give me?

The list describes each finding and where it is in the villa, so you can hand it to the contractor and ask for each point to be fixed before handover or as a condition of it. We make no claim of legal weight for the list, but it is clear documentation that gives you a basis for the conversation.

Is Ash Sheraa within your service area?

Yes, Ash Sheraa is one of the areas we work in, as are Ar Raja, Al Amwaj and As Sawari (near Dhahran). To start, call us or message us on WhatsApp.

Does the inspection include the roof and waterproofing?

Yes, the roof is one of the most important points to check in a new villa. We look at the condition of the waterproof layer, how well it is sealed at the parapet, the AC bases and the drain openings, and we note any spot where water might pond.

Nearby areas

The same service in nearby areas

We also offer villa pre-handover inspection in Ar Raja, Al Amwaj and As Sawari (near Dhahran), among the closest areas to Ash Sheraa.

Other services in the area

More services in Ash Sheraa

White insulated dome on a roof among the houses

Villa pre-handover inspection in Ash Sheraa?
Call us now

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp