Abraj Al AzlContracting
Call العربية
Engineer in a hard hat and high-visibility vest inspecting the facade and roof edge of a new villa

Villa pre-handover inspection in As Salam (near Sayhat)

Inspect before you sign

Full inspection of new villas before handover, covering finishes, plumbing, the roof, electrical points and AC

+966 54 311 2066
The service in your area

Villa pre-handover inspection in As Salam (near Sayhat)

Villa pre-handover inspection in As Salam starts with WhatsApp or a call containing photos of the villa. As Salam has villas under construction in varied designs, and each needs a thorough assessment before handover.

New villas in As Salam vary in size, design and how far they have progressed. A thorough inspection assesses interior and exterior finishes, foundations, walls, ceilings, flooring, doors, windows, electrical switches, points and runs, water and drainage pipes, air conditioning units and the roof. Photos reveal small and large defects that may not be visible to the naked eye.

  • As Salam is a district in the Eastern Province, close to Sayhat, Al Ferdous and Ad Dirah Two.
  • Joints and seals between different building parts may be a source of leaks or damp in new villas.
What the service includes

What the service covers in As Salam (near Sayhat)

  • Checking doors and windows, their frames and the gaps around them
  • Checking finishes including paint, tiles, ceilings and walls
  • Inspecting the roof, the waterproof layer, the parapet and the drain openings
  • Checking electrical points, AC bases and condensate drain outlets
How we work

The stages of the work in As Salam (near Sayhat)

1

Send photos and get in touch

On WhatsApp: photos of the villa or any spot that concerns you, and let us know if a handover date has been set so we can arrange things with you.

2

Check finishes and closures

Walls, ceilings and floors are checked for cracks, voids and stains, and doors and windows are opened and closed to check frames, locks and gaps.

3

Check plumbing, electrical and AC

Taps and WCs are run, electrical points are tested, AC bases and condensate drain outlets are checked, and floor drains in the kitchen and bathrooms are examined.

4

Check the roof and waterproofing

The roof is checked for ponding, the condition of the waterproof layer, the parapet seal, AC bases and drain openings, as these are the points where finish shortfalls show up most.

What sets us apart

Why Abraj Al Azl?

Faults found earlyA fault in the plumbing or the waterproofing grows after you move in; finding it at handover stage limits the damage.

Your request from As Salam (near Sayhat) comes to usCall or WhatsApp on one number, and we answer you ourselves.

Villa pre-handover inspection in As Salam (near Sayhat)We choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Empty seaside pool during waterproofing
Mosaic-tiled seaside pool
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
Pool at night with water jets after waterproofing
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on villa pre-handover inspection in As Salam (near Sayhat)

How many times should I inspect my new villa before taking it from the builder?

One thorough inspection before handover is enough if it is careful. Good photos and detailed checking find most problems. If you request repairs, a second check after repair can confirm they are done.

Can a villa in As Salam be inspected if work is not yet finished?

Yes, an early inspection can identify defects at foundational stages. Early checking gives you time to request corrections before final finishes are done. Send photos of what is completed so far.

Does the inspection include the roof and waterproofing?

Yes, the roof is one of the most important points to check in a new villa. We look at the condition of the waterproof layer, how well it is sealed at the parapet, the AC bases and the drain openings, and we note any spot where water might pond.

What do I do with the findings list you give me?

The list describes each finding and where it is in the villa, so you can hand it to the contractor and ask for each point to be fixed before handover or as a condition of it. We make no claim of legal weight for the list, but it is clear documentation that gives you a basis for the conversation.

What decides the cost of a villa inspection?

The cost depends on the size of the villa, the number of floors, the number of rooms and bathrooms, how accessible the roof is, the condition of the finishes, and whether there are any areas that need particular attention. Send us photos and details of the villa on WhatsApp and we will give you the specifics.

How do I request villa pre-handover inspection in As Salam (near Sayhat)?

Call us, or send clear photos of the spot and its location in As Salam (near Sayhat) on WhatsApp, and we will work out the next step with you.

Nearby areas

Areas near As Salam (near Sayhat)

We also work near As Salam (near Sayhat), in Sayhat, Al Ferdous (near Sayhat) and Ad Dirah Two.

Other services in the area

More services in As Salam (near Sayhat)

White insulated dome on a roof among the houses

Your first step in As Salam (near Sayhat):
a call or a WhatsApp message

Describe the problem and where it is in As Salam (near Sayhat), and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp