Abraj Al AzlContracting
Call العربية
Engineer in a hard hat and high-visibility vest inspecting the facade and roof edge of a new villa

Villa pre-handover inspection in Al Aujam

Inspect before you sign

Full inspection of new villas before handover, covering finishes, plumbing, the roof, electrical points and AC

+966 54 311 2066
The service in your area

Villa pre-handover inspection in Al Aujam

Villa pre-handover inspection in Al Aujam starts by sending photos of concerning parts by call or WhatsApp. Al Aujam is a district of new villas with modern facilities, and the inspection covers all finishes, plumbing, the roof, electrics and cooling systems.

Al Aujam is a growing residential area spreading across detached villas and closely-spaced housing clusters, mixing newly-built villas at varying stages of finish. Each new villa comes with advanced plumbing, electrics and central cooling systems, but small details such as hairline cracks, weak joints and surface flaws may only appear once building is finished. Detailed inspection documents every defect and gives you grounds to request repairs from the builder before final payment.

  • Al Aujam is a residential district in Al Ahsa near Al Awjam, Al Badi and At Talal.
  • Newly-built villas contain many joints and runs, and some internal parts may be prone to minor faults due to stress and heat.
What the service includes

What the service covers in Al Aujam

  • Inspecting the roof, the waterproof layer, the parapet and the drain openings
  • Handing over a written list of findings with the location of each one
  • Checking doors and windows, their frames and the gaps around them
  • Checking finishes including paint, tiles, ceilings and walls
How we work

How we carry out villa pre-handover inspection in Al Aujam

1

Send photos and get in touch

On WhatsApp: photos of the villa or any spot that concerns you, and let us know if a handover date has been set so we can arrange things with you.

2

Check finishes and closures

Walls, ceilings and floors are checked for cracks, voids and stains, and doors and windows are opened and closed to check frames, locks and gaps.

3

Check plumbing, electrical and AC

Taps and WCs are run, electrical points are tested, AC bases and condensate drain outlets are checked, and floor drains in the kitchen and bathrooms are examined.

4

Check the roof and waterproofing

The roof is checked for ponding, the condition of the waterproof layer, the parapet seal, AC bases and drain openings, as these are the points where finish shortfalls show up most.

What sets us apart

Why Abraj Al Azl?

Faults found earlyA fault in the plumbing or the waterproofing grows after you move in; finding it at handover stage limits the damage.

Villa pre-handover inspection in Al AujamWe choose the method and the materials once we know the condition of the spot.

Start from Al Aujam with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Empty seaside pool during waterproofing
Mosaic-tiled seaside pool
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
Pool at night with water jets after waterproofing
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on villa pre-handover inspection in Al Aujam

Does your inspection cover villa roofs and external walls in Al Aujam?

Yes, we check the roof from outside and inside and verify joints, cracks and spots where water might enter. We inspect external walls for defects in construction, paint and cracking.

What should I do if we find defects in the villa before handover in Al Aujam?

We give you a detailed list of every defect we found. You can present it to the builder and ask him to fix every point before you take the villa, or negotiate a reduction with him.

What should I bring or prepare before the inspection?

Bring the villa plan if you have it and any notes you have already sent the contractor. Make sure water and electricity are active in the villa on the day so we can run the taps, test the electrical points and check the AC units. Send us photos of any spot that concerns you beforehand.

Can the inspection find faults hidden behind the walls?

A visual inspection finds what can be seen or measured without breaking in: cracks, stains, voids, falls and visible leaks. What is hidden inside walls with no visible sign needs specialist detection tools that are different from this inspection. We explain what can be covered when we agree the job.

What do I do with the findings list you give me?

The list describes each finding and where it is in the villa, so you can hand it to the contractor and ask for each point to be fixed before handover or as a condition of it. We make no claim of legal weight for the list, but it is clear documentation that gives you a basis for the conversation.

How do I request villa pre-handover inspection in Al Aujam?

Call us, or send clear photos of the spot and its location in Al Aujam on WhatsApp, and we will work out the next step with you.

Nearby areas

Areas near Al Aujam

If the site is outside Al Aujam, the same service is available in Al Awjam, Al Badi (near Al Awjam) and At Talal (near Al Awjam).

Other services in the area

More services in Al Aujam

White insulated dome on a roof among the houses

We start with you in Al Aujam
with one call

Describe the problem and where it is in Al Aujam, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp