
Villa pre-handover inspection in Al Anud
Villa pre-handover inspection in Al Anud starts with photos sent by phone or WhatsApp. The new building is inspected from foundation to roof, finishes, plumbing, electrical points, and air conditioning, to ensure all details are complete before you take ownership.
Al Anud comprises new villas at various stages of construction, each needing a thorough pre-handover inspection. Interior and exterior finishes, electrical work, and plumbing all require careful review, as do cooling and ventilation systems. Initial photos may reveal points needing attention, and a full inspection will clarify the condition of each part of the villa before you sign for it.
- Al Anud is a district in the Eastern Province, situated near Al Aziziyah, Al Jalawiyah and Al Khalij, with new residential buildings and villas under construction.
- A new villa requires systematic inspection covering every contact point between materials and systems before occupation begins.
The scope of the work in Al Anud
- Checking doors and windows, their frames and the gaps around them
- Handing over a written list of findings with the location of each one
- Checking finishes including paint, tiles, ceilings and walls
- Checking electrical points, AC bases and condensate drain outlets
The stages of the work in Al Anud
Send photos and get in touch
On WhatsApp: photos of the villa or any spot that concerns you, and let us know if a handover date has been set so we can arrange things with you.
Check finishes and closures
Walls, ceilings and floors are checked for cracks, voids and stains, and doors and windows are opened and closed to check frames, locks and gaps.
Check plumbing, electrical and AC
Taps and WCs are run, electrical points are tested, AC bases and condensate drain outlets are checked, and floor drains in the kitchen and bathrooms are examined.
Check the roof and waterproofing
The roof is checked for ponding, the condition of the waterproof layer, the parapet seal, AC bases and drain openings, as these are the points where finish shortfalls show up most.
Why Abraj Al Azl?
Faults found earlyA fault in the plumbing or the waterproofing grows after you move in; finding it at handover stage limits the damage.
We serve Al Anud and around itIncluding Al Aziziyah (near Sayhat), Al Jalawiyah and Al Khalij (near Dammam), as part of our work across the Eastern Province.
Start from Al Anud with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
Your questions on villa pre-handover inspection in Al Anud
What does villa inspection cover before handover in Al Anud?
Inspection covers finishes and walls, pipes and water lines, electrical wiring and lighting, air conditioning and ventilation, doors, windows and stairs. You send photos and we tell you what needs correcting before handover.
Do you inspect roofs and drainage on new villas in Al Anud?
Yes, the roof and drainage are core parts of the inspection. We check the building condition, roof slope and drainage pipes to prevent problems after handover.
Is Al Anud within your service area?
Yes, Al Anud is one of the areas we work in, as are Al Aziziyah (near Sayhat), Al Jalawiyah and Al Khalij (near Dammam). To start, call us or message us on WhatsApp.
Does the inspection include the roof and waterproofing?
Yes, the roof is one of the most important points to check in a new villa. We look at the condition of the waterproof layer, how well it is sealed at the parapet, the AC bases and the drain openings, and we note any spot where water might pond.
What should I bring or prepare before the inspection?
Bring the villa plan if you have it and any notes you have already sent the contractor. Make sure water and electricity are active in the villa on the day so we can run the taps, test the electrical points and check the AC units. Send us photos of any spot that concerns you beforehand.
What does a pre-handover villa inspection cover?
The inspection covers internal and external finishes including paint, tiles and ceilings, doors and windows with their frames, plumbing and sanitary points, electrical sockets and switches, AC bases and condensate drain outlets, and the roof with its waterproof layer, parapet and drain openings. It ends with a written list of findings.
We also offer it in neighbouring areas
Nearby areas we also cover: Al Aziziyah (near Sayhat), Al Jalawiyah and Al Khalij (near Dammam).
More services in Al Anud


