
PVC membrane waterproofing in Al Quds District
PVC membrane waterproofing for roofs and tanks in Al Quds District starts with a photo sent by call or WhatsApp. The district has apartment blocks and villas whose roofs often leak and grow damp from cracks and weak joints. A PVC membrane protects with a sealed layer and waterproofs all vents and openings.
The area has buildings of different ages with roofs ranging from simple flat to complex multi-level. Older roofs may bear traces of past repairs or dirt buildup requiring cleaning before sheeting is applied. PVC rolls adhere to the roof and wrap all pipe openings, vents and corners. Photos show roof condition in detail to select the right material and method.
- Al Quds District is a residential district in the Eastern Province near Al Muhandisin, Al Badriyah and As Suqur districts, with apartment blocks and villas.
- Corners and edges on multi-level roofs need special care when covering with PVC membrane to ensure a complete seal.
The main items of PVC membrane waterproofing in Al Quds District
- Cleaning the surface and treating cracks and joints before laying
- Adding a protection layer over the membrane on exposed roofs
- Sealing the layer at the parapet, AC bases and all penetrations
- Laying PVC sheets and fixing them by the method that suits the site
This is how we work in Al Quds District
Send photos of the roof or tank
On WhatsApp: photos of the full roof, the parapet, AC bases, pipe openings and drains, so we can assess the surface and decide the right fixing method and treatment.
Prepare the surface
The concrete slab is cleaned and cracks and joints are treated; old insulation is removed where its condition does not allow installation over it, and the surface is left to dry before any further step.
Lay the sheets and weld the seams
PVC sheets are laid across the surface and fixed by the method that suits the position; seams between sheets are welded with hot air, and the layer is turned up at the parapet and around penetrations.
Check the seams and add the protection layer
Welded seams are checked for continuity, then a protection layer or ballast is added over the membrane on exposed roofs so the PVC is kept from direct sun and foot traffic.
Why Abraj Al Azl?
Flexibility under slab movementIntense heat expands and contracts concrete, and PVC sheets follow that movement without cracking or pulling away.
Al Quds District is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
Start from Al Quds District with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
أفضل شركة عزل اسطح الفوم وخزانات المياه
Real Google reviews, shown exactly as their authors wrote them.
Before you book PVC membrane waterproofing in Al Quds District
Is PVC sheeting suitable for roof tanks in Al Quds District?
Yes, PVC sheeting waterproofs both roof and ground tanks and protects from heat and water. Photos of the tank and its location show the right fixing method.
What if the roof in Al Quds is not clean before PVC sheeting is applied?
Cleaning is essential before starting. Dirt and deposits prevent good adhesion and leave gaps for water to enter. Photos show whether cleaning is needed and how much.
How are PVC sheets sealed around AC bases and pipe penetrations?
At each penetration the sheet is cut closely and welded around it with shaped PVC pieces, so no open edge remains. These points are the most common source of roof leaks, so they receive careful attention before moving on to the protection layer.
Do PVC sheets need a protection layer on top?
On roofs exposed to sun and foot traffic, a protection layer goes over the PVC, such as ballast, gravel or protection boards, to extend the membrane's life and shield it from mechanical wear and ultraviolet light. For tanks and pools the need is assessed by use.
Do you offer PVC membrane waterproofing in Al Quds District?
Yes. Al Quds District is within our service area in the Eastern Province, and we also work in Al Muhandisin District, Al Badriyah District and As Suqur District. Call us or send photos of the spot on WhatsApp.
What decides the cost of a PVC roof waterproofing job?
The roof area, the condition of the concrete slab, the number of penetrations and AC bases, whether the old membrane must be removed, the fixing method that suits the site and how easily it can be reached. Send photos and rough dimensions on WhatsApp and we will advise on the treatment.
We also offer it in neighbouring areas
We also work near Al Quds District, in Al Muhandisin District, Al Badriyah District and As Suqur District.
More services in Al Quds District



