
PVC membrane waterproofing in Al Khalidiyah Ash Shamaliyah
PVC membrane waterproofing in Al Khalidiyah Ash Shamaliyah starts with photos of the roof or tank sent by call or WhatsApp. The area has villas and apartment buildings with varied roofs needing protection from leaks and moisture.
Al Khalidiyah Ash Shamaliyah has modern villas and mid-range apartment buildings with roofs of different designs and conditions. Exposed roof surfaces around buildings face direct sun and climate shifts, with cracks possibly appearing at joints and openings, and water pooling in places. PVC membranes provide flexible, durable cover across the entire surface and seal all penetrations and edges securely. One photo of the roof helps us understand the area size and problems needing attention before installation.
- Al Khalidiyah Ash Shamaliyah is a district in the Eastern Province, close to the First Industrial area and Al Khalidiyah Al Janubiyah, with villas and residential buildings.
- Residential roofs may be large areas with multiple openings, each requiring separate sealing.
The main items of PVC membrane waterproofing in Al Khalidiyah Ash Shamaliyah
- Sealing the layer at the parapet, AC bases and all penetrations
- Cleaning the surface and treating cracks and joints before laying
- Inspecting the concrete slab and assessing the old membrane
- Laying PVC sheets and fixing them by the method that suits the site
From first contact to the finished job in Al Khalidiyah Ash Shamaliyah
Send photos of the roof or tank
On WhatsApp: photos of the full roof, the parapet, AC bases, pipe openings and drains, so we can assess the surface and decide the right fixing method and treatment.
Prepare the surface
The concrete slab is cleaned and cracks and joints are treated; old insulation is removed where its condition does not allow installation over it, and the surface is left to dry before any further step.
Lay the sheets and weld the seams
PVC sheets are laid across the surface and fixed by the method that suits the position; seams between sheets are welded with hot air, and the layer is turned up at the parapet and around penetrations.
Check the seams and add the protection layer
Welded seams are checked for continuity, then a protection layer or ballast is added over the membrane on exposed roofs so the PVC is kept from direct sun and foot traffic.
Why Abraj Al Azl?
Flexibility under slab movementIntense heat expands and contracts concrete, and PVC sheets follow that movement without cracking or pulling away.
We serve Al Khalidiyah Ash Shamaliyah and around itIncluding First Industrial (near Dammam), Al Khalidiyah Al Janubiyah and An Nasriyah, as part of our work across the Eastern Province.
Al Khalidiyah Ash Shamaliyah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
What customers ask in Al Khalidiyah Ash Shamaliyah
Are PVC membranes suitable for mid-range apartment buildings in Al Khalidiyah Ash Shamaliyah?
Yes, PVC membranes suit apartment roofs of any size. Send a photo of the building roof and around openings and edges, and we will calculate the membranes needed.
How are joints between PVC membranes sealed on large roofs?
Joints are laid with tight overlap and sealed with specialised materials to prevent any seepage. Photos show roof size to plan joint positions before work starts.
How are PVC sheets sealed around AC bases and pipe penetrations?
At each penetration the sheet is cut closely and welded around it with shaped PVC pieces, so no open edge remains. These points are the most common source of roof leaks, so they receive careful attention before moving on to the protection layer.
How are PVC sheet seams welded and can they be checked?
Seams are welded with a hot-air welder that melts the surface of both sheets and presses them together so they fuse. Once cooled, the seams are checked by hand and with specialist tools to confirm no unjoined spot remains. This check is part of the work and happens before the protection layer goes on.
What is the difference between PVC sheets and bitumen rolls for roof waterproofing?
Bitumen rolls are usually torch-applied and are stiffer, while PVC sheets are lighter, more flexible and their seams are welded with hot air rather than a flame. Each suits different situations; send photos of the roof so we can advise which fits.
What should I send you from Al Khalidiyah Ash Shamaliyah?
Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Khalidiyah Ash Shamaliyah, and we will work out the next step with you.
Areas near Al Khalidiyah Ash Shamaliyah
Nearby areas we also cover: First Industrial (near Dammam), Al Khalidiyah Al Janubiyah and An Nasriyah.
More services in Al Khalidiyah Ash Shamaliyah



