
PVC membrane waterproofing in Al Khafji Customs
PVC membrane waterproofing at Al Khafji Customs starts with photos sent by call or WhatsApp. The customs post has small administrative and commercial buildings, cooling fans and tanks, with many roofs exposed to humid Gulf air and intense heat.
The customs buildings face humid, salt-laden Gulf air that speeds the decay of unsuitable linings. PVC membranes provide an airtight barrier against water, vapour and salt together, and joints and penetrations around pipes and entries need special care as they are weak points. Harsh heat stresses the material, but PVC is designed to endure it. Photos show the roof's current state and exposure to salt and damp before choosing the fixing method.
- Al Khafji Customs is a coastal area on the western Arabian Gulf in the Eastern Province, near Al Muruj and across the Gulf.
- Salt and moisture from coastal air penetrate most traditional materials, so coastal roofs need a strongly sealed barrier.
The PVC membrane waterproofing work in Al Khafji Customs
- Laying PVC sheets and fixing them by the method that suits the site
- Welding seams with hot air and checking them after cooling
- Cleaning the surface and treating cracks and joints before laying
- Sealing the layer at the parapet, AC bases and all penetrations
How we carry out PVC membrane waterproofing in Al Khafji Customs
Send photos of the roof or tank
On WhatsApp: photos of the full roof, the parapet, AC bases, pipe openings and drains, so we can assess the surface and decide the right fixing method and treatment.
Prepare the surface
The concrete slab is cleaned and cracks and joints are treated; old insulation is removed where its condition does not allow installation over it, and the surface is left to dry before any further step.
Lay the sheets and weld the seams
PVC sheets are laid across the surface and fixed by the method that suits the position; seams between sheets are welded with hot air, and the layer is turned up at the parapet and around penetrations.
Check the seams and add the protection layer
Welded seams are checked for continuity, then a protection layer or ballast is added over the membrane on exposed roofs so the PVC is kept from direct sun and foot traffic.
Why Abraj Al Azl?
The seam disappears in the weldHeat welding fuses the two sheet edges into one layer, so no exposed edge remains for water to get through.
Al Khafji Customs is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
Start from Al Khafji Customs with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Questions about PVC membrane waterproofing in Al Khafji Customs
Do PVC membranes resist salt at Al Khafji Customs?
Yes, PVC resists salt and salt water. Full protection requires airtight sealing of every joint and penetration, and photos show where extra care is needed.
How often should PVC membranes be inspected at a coastal post?
Regular inspection helps catch any cracking or separation early. Start by sending photos of the roof at intervals and tell us if you see any change, so we can decide with you if action is needed.
What decides the cost of a PVC roof waterproofing job?
The roof area, the condition of the concrete slab, the number of penetrations and AC bases, whether the old membrane must be removed, the fixing method that suits the site and how easily it can be reached. Send photos and rough dimensions on WhatsApp and we will advise on the treatment.
How are PVC sheet seams welded and can they be checked?
Seams are welded with a hot-air welder that melts the surface of both sheets and presses them together so they fuse. Once cooled, the seams are checked by hand and with specialist tools to confirm no unjoined spot remains. This check is part of the work and happens before the protection layer goes on.
How are PVC sheets sealed around AC bases and pipe penetrations?
At each penetration the sheet is cut closely and welded around it with shaped PVC pieces, so no open edge remains. These points are the most common source of roof leaks, so they receive careful attention before moving on to the protection layer.
Is Al Khafji Customs within your service area?
Yes, Al Khafji Customs is one of the areas we work in, as are Western Arabian Gulf, Eastern Arabian Gulf and Al Muruj (near Al Khafji). To start, call us or message us on WhatsApp.
We also offer it in neighbouring areas
We also offer PVC membrane waterproofing in Western Arabian Gulf, Eastern Arabian Gulf and Al Muruj (near Al Khafji), among the closest areas to Al Khafji Customs.
More services in Al Khafji Customs



