
PVC membrane waterproofing in Al Hamra Third District
PVC membrane waterproofing in Al Hamra Third District is planned from photos of the roof or tank, sent to us by call or WhatsApp. Sheets are laid with welded seams and treated penetrations, and we serve Al Hamra Third District in the Eastern Province. The layout depends on how the roof is divided and what stands on it.
Al Hamra Third District is largely apartment buildings, often several storeys high, where the roof is shared by the whole block and carries rooftop water tanks and air conditioning plant. A membrane on such a roof is usually divided into bays, so the joints between sheets and the upstands at the parapet walls matter as much as the open field. Tank bases and the pipes that rise through the roof are common points of water entry and need careful sealing. The photos help us decide how the bays should be set out and where the detail work sits.
- Al Hamra Third District is a residential district in the Eastern Province, lying near Al Hamra Second District and Al Asimah District.
- On shared roofs, joints and parapet upstands often need the closest attention.
What the service covers in Al Hamra Third District
- Cleaning the surface and treating cracks and joints before laying
- Inspecting the concrete slab and assessing the old membrane
- Adding a protection layer over the membrane on exposed roofs
- Laying PVC sheets and fixing them by the method that suits the site
This is how we work in Al Hamra Third District
Send photos of the roof or tank
On WhatsApp: photos of the full roof, the parapet, AC bases, pipe openings and drains, so we can assess the surface and decide the right fixing method and treatment.
Prepare the surface
The concrete slab is cleaned and cracks and joints are treated; old insulation is removed where its condition does not allow installation over it, and the surface is left to dry before any further step.
Lay the sheets and weld the seams
PVC sheets are laid across the surface and fixed by the method that suits the position; seams between sheets are welded with hot air, and the layer is turned up at the parapet and around penetrations.
Check the seams and add the protection layer
Welded seams are checked for continuity, then a protection layer or ballast is added over the membrane on exposed roofs so the PVC is kept from direct sun and foot traffic.
Why Abraj Al Azl?
Flexibility under slab movementIntense heat expands and contracts concrete, and PVC sheets follow that movement without cracking or pulling away.
PVC membrane waterproofing in Al Hamra Third DistrictWe choose the method and the materials once we know the condition of the spot.
Start from Al Hamra Third District with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Questions about PVC membrane waterproofing in Al Hamra Third District
Will shared roof tanks need to be lifted for the work?
Not always. Whether a tank must be moved depends on where its base sits and how the membrane has to run beneath or around it. The photos of the tank and its base will show us which approach suits the roof.
Can someone on an upper floor send photos for the roof?
Yes, whoever looks after the roof can send them. Include how the roof is reached, the tanks and the edges, and say which floor the roof belongs to so we can judge access before we continue with you.
How are PVC sheet seams welded and can they be checked?
Seams are welded with a hot-air welder that melts the surface of both sheets and presses them together so they fuse. Once cooled, the seams are checked by hand and with specialist tools to confirm no unjoined spot remains. This check is part of the work and happens before the protection layer goes on.
Do you cover Al Hamra Third District?
Yes. We serve Al Hamra Third District and nearby areas such as Al Hamra Second District, Al Asimah District and Al Omaraa District, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.
What decides the cost of a PVC roof waterproofing job?
The roof area, the condition of the concrete slab, the number of penetrations and AC bases, whether the old membrane must be removed, the fixing method that suits the site and how easily it can be reached. Send photos and rough dimensions on WhatsApp and we will advise on the treatment.
What is the difference between PVC sheets and bitumen rolls for roof waterproofing?
Bitumen rolls are usually torch-applied and are stiffer, while PVC sheets are lighter, more flexible and their seams are welded with hot air rather than a flame. Each suits different situations; send photos of the roof so we can advise which fits.
Areas near Al Hamra Third District
If the site is outside Al Hamra Third District, the same service is available in Al Hamra Second District, Al Asimah District and Al Omaraa District.
More services in Al Hamra Third District



