Abraj Al AzlContracting
Call العربية
Worker heat-welding a seam of light grey PVC membrane on a roof

PVC membrane waterproofing in Al Badr

No exposed seams

PVC sheet waterproofing for roofs and tanks, with sealed edges and penetrations throughout

+966 54 311 2066
The service in your area

PVC membrane waterproofing in Al Badr

PVC membrane waterproofing for roofs and tanks in Al Badr begins with WhatsApp photos or a direct call. The durable plastic sheet covers the roof with a tight seal that protects against leaks, damp and cracks. This method suits homes, buildings and tanks across the district.

Al Badr has homes, villas and residential buildings of mixed age, many needing strong roof and tank waterproofing. Open roofs face sun heat and seasonal moisture, and cracks and leaks can show with age. PVC sheets give lasting protection and tolerate heat and seasonal changes, and tightly sealed corners and edges keep water out. Tanks on roofs or in yards benefit from the strong waterproofing the sheets provide.

  • Al Badr is a district in the Eastern Province, near Al Bustan One and Qurtubah, with mixed residential buildings and homes.
  • PVC sheets resist both heat and moisture and stay flexible at the edges so they do not crack or peel over time.
What the service includes

The scope of the work in Al Badr

  • Cleaning the surface and treating cracks and joints before laying
  • Adding a protection layer over the membrane on exposed roofs
  • Sealing the layer at the parapet, AC bases and all penetrations
  • Inspecting the concrete slab and assessing the old membrane
How we work

From first contact to the finished job in Al Badr

1

Send photos of the roof or tank

On WhatsApp: photos of the full roof, the parapet, AC bases, pipe openings and drains, so we can assess the surface and decide the right fixing method and treatment.

2

Prepare the surface

The concrete slab is cleaned and cracks and joints are treated; old insulation is removed where its condition does not allow installation over it, and the surface is left to dry before any further step.

3

Lay the sheets and weld the seams

PVC sheets are laid across the surface and fixed by the method that suits the position; seams between sheets are welded with hot air, and the layer is turned up at the parapet and around penetrations.

4

Check the seams and add the protection layer

Welded seams are checked for continuity, then a protection layer or ballast is added over the membrane on exposed roofs so the PVC is kept from direct sun and foot traffic.

What sets us apart

Why Abraj Al Azl?

The seam disappears in the weldHeat welding fuses the two sheet edges into one layer, so no exposed edge remains for water to get through.

Your request from Al Badr comes to usCall or WhatsApp on one number, and we answer you ourselves.

We serve Al Badr and around itIncluding Al Bustan One, Inak and Qurtubah (near Inak), as part of our work across the Eastern Province.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book PVC membrane waterproofing in Al Badr

Can PVC sheets be fitted to an old roof in Al Badr?

Yes, if the underlying structure is sound. We clean the roof and check for cracks and weak areas before laying. Photos tell us whether extra repairs are needed before the sheet goes down.

How long does laying PVC sheet on a water tank take?

Time depends on the tank's size, location and surface condition. The initial photos and call help us estimate the time needed. We will work out a timescale with you once your tank's needs are clear.

What decides the cost of a PVC roof waterproofing job?

The roof area, the condition of the concrete slab, the number of penetrations and AC bases, whether the old membrane must be removed, the fixing method that suits the site and how easily it can be reached. Send photos and rough dimensions on WhatsApp and we will advise on the treatment.

How are PVC sheet seams welded and can they be checked?

Seams are welded with a hot-air welder that melts the surface of both sheets and presses them together so they fuse. Once cooled, the seams are checked by hand and with specialist tools to confirm no unjoined spot remains. This check is part of the work and happens before the protection layer goes on.

Is Al Badr within your service area?

Yes, Al Badr is one of the areas we work in, as are Al Bustan One, Inak and Qurtubah (near Inak). To start, call us or message us on WhatsApp.

How are PVC sheets sealed around AC bases and pipe penetrations?

At each penetration the sheet is cut closely and welded around it with shaped PVC pieces, so no open edge remains. These points are the most common source of roof leaks, so they receive careful attention before moving on to the protection layer.

Nearby areas

We also offer it in neighbouring areas

We also offer PVC membrane waterproofing in Al Bustan One, Inak and Qurtubah (near Inak), among the closest areas to Al Badr.

Other services in the area

More services in Al Badr

Villa roof finished in white insulation with a glass railing over the sea

PVC membrane waterproofing in Al Badr?
Call us now

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp