
Cementitious waterproofing in Al Khobar
Cementitious waterproofing for tanks, bathrooms and basements in Al Khobar starts with a WhatsApp photo of the area to be treated. The city has modern and older residential buildings and villas, many of which need damp and leak treatment in basements, bathrooms and internal tanks.
Al Khobar has old villas with basements prone to damp and modern apartment blocks with advanced drainage systems. Basements, bathrooms and interior walls face moisture from rare but heavy rains and also from leaks through foundations and pipes. Cementitious waterproofing creates a protective layer on the inner surface to stop water seeping into the structure; the photos show where the problem is and how much the material is affected before the layer thickness and treatment method are chosen.
- Al Khobar is a city in the Eastern Province, beside Dammam and Dhahran, with villas and residential buildings of varying ages.
- Bathrooms, basements and internal tanks in coastal buildings face continuous airborne moisture that accelerates the decay of unprotected materials.
What we do for you in Al Khobar
- Cleaning the surface and removing loose or flaking layers
- Leaving the layer to dry and harden fully before any finish or filling
- Mixing and applying the cementitious material by brush or spray to suit the surface
- Turning the coat up at corners and fixture openings to close every weak point
The stages of the work in Al Khobar
Send photos of the area
Call us or send photos of the wall, tank or bathroom on WhatsApp, so we can read the surface and decide whether a rigid or flexible cementitious type suits best.
Prepare and clean the surface
The surface is cleaned of dust, grease and loose layers, and cracks, joints and voids are treated with a suitable filler so the coating bonds firmly.
Mix and apply the coating
The cementitious material is mixed to the right consistency, then brushed or sprayed depending on the surface, and turned up at corners and joints to close every weak point.
Cure and protect
The layer is left to dry and harden, and is not exposed to water or load before it is fully set. The final finish above it is decided by the location.
Why Abraj Al Azl?
A surface ready for finishingThe coating accepts tiles, render and paint directly on top, so it adds no visible build-up and does not change how the surface looks.
Start from Al Khobar with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
Your request from Al Khobar comes to usCall or WhatsApp on one number, and we answer you ourselves.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
أفضل شركة عزل اسطح الفوم وخزانات المياه
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
Before you book cementitious waterproofing in Al Khobar
Does cementitious waterproofing stop damp in an old basement in Al Khobar?
It depends on the cause of the damp. If it is from air moisture or minor seepage then yes, but if water is entering forcefully through the foundation, the photos will show it and we will determine the treatment with you.
Can a bathroom in an apartment block be waterproofed without removing the tiles?
Not always. If the damp is under the tiles, they must come off first to treat the base surface. Photos explain the condition and show what needs to be done.
Is cementitious waterproofing safe for drinking water tanks?
Yes. The material is mineral-based and contains no solvents or chemicals that migrate into the water, so it is widely used to line drinking water tanks. It must be fully cured and set before the tank is filled. Send a photo of the tank on WhatsApp and we will advise the right treatment.
What is the difference between rigid and flexible cementitious waterproofing?
The rigid type sets like concrete and suits stable surfaces such as tank walls and basements that do not move. The flexible type contains polymer additives that let it absorb slight surface movement, making it suitable for bathrooms and areas that may take minor vibration. The surface type and its condition decide which is used.
What should I send you from Al Khobar?
Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Khobar, and we will work out the next step with you.
Can tiles be laid directly over cementitious waterproofing?
Yes, and this is one reason it is chosen for bathrooms and floors: it accepts render, tiles and adhesive directly over it once set, with no intermediate layer needed. The right time to start tiling is after the coating is fully cured.
The same service in nearby areas
We also work near Al Khobar, in Al Hizam Al Akhdar, Al Aqrabiyah and Al Hada.
More services in Al Khobar



