Abraj Al AzlContracting
Call العربية
Worker troweling a grey cementitious coat on a concrete retaining wall

Cementitious waterproofing in Al Aziziyah First District

It bonds into the concrete

Mineral cementitious waterproofing for tanks, bathrooms, basements and internal walls

+966 54 311 2066
The service in your area

Cementitious waterproofing in Al Aziziyah First District

Cementitious waterproofing in Al Aziziyah First District starts with photos of damaged walls or tanks sent by call or WhatsApp. The district has villas and apartment blocks, whose bathrooms and basements often need mineral cementitious treatment for damp and cracks.

Al Aziziyah First District mixes modern villas with apartment blocks built over years, and both can suffer water seeping through internal walls or foundations. Older bathrooms show persistent damp around walls and floors, while newer villas may need small cracks sealed before they spread. Cementitious treatment bonds directly to the internal surface, but its thickness and application method vary with the moisture source and depth of seepage, details the photos will reveal.

  • Al Aziziyah First District is a residential district in the Eastern Province, next to Al Hamra First District and Government Departments Complex Second District.
  • Internal bathroom walls and foundations face persistent moisture, so their treatment must be a mineral compound capable of lasting adhesion.
What the service includes

The main items of cementitious waterproofing in Al Aziziyah First District

  • Leaving the layer to dry and harden fully before any finish or filling
  • Mixing and applying the cementitious material by brush or spray to suit the surface
  • Treating cracks, corners, drain openings and pipe runs
  • Turning the coat up at corners and fixture openings to close every weak point
How we work

The stages of the work in Al Aziziyah First District

1

Send photos of the area

Call us or send photos of the wall, tank or bathroom on WhatsApp, so we can read the surface and decide whether a rigid or flexible cementitious type suits best.

2

Prepare and clean the surface

The surface is cleaned of dust, grease and loose layers, and cracks, joints and voids are treated with a suitable filler so the coating bonds firmly.

3

Mix and apply the coating

The cementitious material is mixed to the right consistency, then brushed or sprayed depending on the surface, and turned up at corners and joints to close every weak point.

4

Cure and protect

The layer is left to dry and harden, and is not exposed to water or load before it is fully set. The final finish above it is decided by the location.

What sets us apart

Why Abraj Al Azl?

A surface ready for finishingThe coating accepts tiles, render and paint directly on top, so it adds no visible build-up and does not change how the surface looks.

Cementitious waterproofing in Al Aziziyah First DistrictWe choose the method and the materials once we know the condition of the spot.

We serve Al Aziziyah First District and around itIncluding Al Hamra First District, Government Departments Complex Second District and An Nayfiyah District, as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book cementitious waterproofing in Al Aziziyah First District

Is cementitious waterproofing suitable for damp foundations in Al Aziziyah First District?

Yes, if the concrete itself is sound. We check the photos first to see whether moisture comes from the soil or from a pipe leak, then choose the right approach.

Can cementitious waterproofing be applied to an old bathroom wall without demolition?

Yes, it is applied directly to the internal surface after cleaning. However, if tiles or paint are very thick or adhere poorly, we may need to remove some to ensure the treatment bonds properly.

What decides the cost of cementitious waterproofing?

The size of the surface to be treated, its condition in terms of cracks and damage, how many corners and openings need extra treatment, how easily the site can be reached, and whether tiles must be lifted or prior preparation is needed. Send photos and rough dimensions of the tank, bathroom or wall on WhatsApp and we will advise on the treatment and the cost.

What should I send you from Al Aziziyah First District?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Aziziyah First District, and we will work out the next step with you.

Is cementitious waterproofing safe for drinking water tanks?

Yes. The material is mineral-based and contains no solvents or chemicals that migrate into the water, so it is widely used to line drinking water tanks. It must be fully cured and set before the tank is filled. Send a photo of the tank on WhatsApp and we will advise the right treatment.

Can tiles be laid directly over cementitious waterproofing?

Yes, and this is one reason it is chosen for bathrooms and floors: it accepts render, tiles and adhesive directly over it once set, with no intermediate layer needed. The right time to start tiling is after the coating is fully cured.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: Al Hamra First District, Government Departments Complex Second District and An Nayfiyah District.

Other services in the area

More services in Al Aziziyah First District

Two workers in high-visibility vests insulating a roof beside the AC units

Your first step in Al Aziziyah First District:
a call or a WhatsApp message

Describe the problem and where it is in Al Aziziyah First District, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp