
Bitumen & membrane insulation in At Tubayshi
Bitumen and membrane insulation for roofs, bathrooms and tanks in At Tubayshi begins with photos sent by call or WhatsApp. The district has villas and apartment blocks of various ages with varying building density.
At Tubayshi has old individual houses, newer villas and multi-storey apartment blocks, reflected in the range of damp and leak problems. Older houses often suffer roof and bathroom leaks due to weak or worn old lining. Apartment blocks may need insulation on shared roofs, tanks and areas between units. Intense summer heat and seasonal moisture stress any lining, and photos help determine whether spot repair is enough or wider renewal is needed.
- At Tubayshi is a district in the Eastern Province near An Nasriyah, Prince Muhammed Ibn Saud and Al Mazruiyah, with villas and apartment blocks at varying density.
- Multi-storey apartment blocks suffer leaks on shared roofs and high tanks due to building movement and slight vibrations that cause cracks.
What we do for you in At Tubayshi
- Inspecting the surface and locating leak points, cracks and joints
- Treating cracks, the parapet, drain openings and AC bases
- Applying the waterproof layer in the material that suits the location: bitumen rolls, PVC sheet or cementitious coating
- Adding the right protective layer once the waterproofing has dried and cured
The steps of bitumen & membrane insulation in At Tubayshi
Send photos of the site
On WhatsApp: photos of the roof, wall or foundation with any cracks, stains or drain outlets, so we can read the condition and choose the right material and method.
Prepare the surface
The surface is cleaned of dust and deposits, cracks and joints and any existing blisters are treated, and drain outlets and AC bases are prepared before anything is applied.
Apply the waterproof layers
The layer goes on in the way that suits the chosen material: torch welding for bitumen rolls, adhesive fixing for cold rolls, brush application for cementitious coatings or heat welding for PVC sheets. It turns up at the walls and closes around every opening.
Protection and finishing
The layer is left to dry and cure, then the right protective layer goes over it: gravel, mortar or tiles depending on where it is, to protect the waterproofing from heat and wear.
Why Abraj Al Azl?
Material matched to the surface and water typeBitumen rolls, cementitious coatings and PVC sheets each perform best in different situations. The wrong choice shortens the life of the waterproofing.
Your request from At Tubayshi comes to usCall or WhatsApp on one number, and we answer you ourselves.
Bitumen & membrane insulation in At TubayshiWe choose the method and the materials once we know the condition of the spot.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Your questions on bitumen & membrane insulation in At Tubayshi
How do you handle bathroom leaks in an apartment block?
We rely on photos to locate the leak and affected walls. We may waterproof just the leak point or recommend wider insulation depending on the bathroom and surrounding pipes.
Does building movement in At Tubayshi affect waterproofing?
Yes, movement and slight vibrations may cause cracks in old lining. So flexible materials that tolerate this movement without breaking or cracking must be used.
Are asphalt rolls suitable for a roof that is walked on?
Asphalt rolls on a walkable roof need a protective layer over them, gravel, mortar or tiles, because direct wear and weight damage the layer over time. Without that protection the waterproofing life is shortened. We choose the protection type from the photos and how the roof is used.
Can gravel-faced rolls be applied over old waterproofing on an existing roof?
It depends on the condition of the old layer. If it is well bonded and free of wide blistering and cracking it may serve as a base. If it is deteriorated or blistered over large areas it must be removed first, because new waterproofing over a weak surface will not hold. Send photos of the existing roof so we can assess.
Does the surface need a levelling screed before bitumen rolls go on?
A clean, even surface free of blisters gives the waterproofing a better bond. If there are low spots where water ponds or the surface is uneven, those are corrected before the rolls go on. We read the surface condition from the photos and say what preparation is needed before the rolls are laid.
Is At Tubayshi within your service area?
Yes, At Tubayshi is one of the areas we work in, as are An Nasriyah, Prince Muhammed Ibn Saud and Al Mazruiyah. To start, call us or message us on WhatsApp.
Areas near At Tubayshi
We also work near At Tubayshi, in An Nasriyah, Prince Muhammed Ibn Saud and Al Mazruiyah.
More services in At Tubayshi




