
Bitumen & membrane insulation in Ash Sheraa
In Ash Sheraa we provide bitumen and membrane insulation for roofs, foundations, tanks and bathrooms. Send site photos on WhatsApp or call us to begin the review.
Ash Sheraa lies between Ar Raja, Al Amwaj and As Sawari, with mid-rise residential blocks and attached units. Many roofs here are flat and carry water tanks, where a protected layered system works better than patching. Photos reveal the condition of joints, cracks and edges, and the system is then matched to the load and movement of each roof.
- Ash Sheraa is a residential district in the Eastern Province, near Ar Raja, Al Amwaj and As Sawari.
- Edges and penetrations on a roof usually need more attention than the open field.
What we do for you in Ash Sheraa
- Closing the layer at all edges, walls and penetrations
- Cleaning the surface and removing deteriorated layers where needed
- Inspecting the surface and locating leak points, cracks and joints
- Treating cracks, the parapet, drain openings and AC bases
The stages of the work in Ash Sheraa
Send photos of the site
On WhatsApp: photos of the roof, wall or foundation with any cracks, stains or drain outlets, so we can read the condition and choose the right material and method.
Prepare the surface
The surface is cleaned of dust and deposits, cracks and joints and any existing blisters are treated, and drain outlets and AC bases are prepared before anything is applied.
Apply the waterproof layers
The layer goes on in the way that suits the chosen material: torch welding for bitumen rolls, adhesive fixing for cold rolls, brush application for cementitious coatings or heat welding for PVC sheets. It turns up at the walls and closes around every opening.
Protection and finishing
The layer is left to dry and cure, then the right protective layer goes over it: gravel, mortar or tiles depending on where it is, to protect the waterproofing from heat and wear.
Why Abraj Al Azl?
A continuous layer with no weak pointsProper waterproofing closes at the parapet, drain openings and AC bases, not only over the open flat area.
Bitumen & membrane insulation in Ash SheraaWe choose the method and the materials once we know the condition of the spot.
We serve Ash Sheraa and around itIncluding Ar Raja, Al Amwaj and As Sawari (near Dhahran), as part of our work across the Eastern Province.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
What customers ask in Ash Sheraa
Can a roof of attached buildings in Ash Sheraa be insulated without emptying the units?
That depends on the work area and how the roof is reached. We set the method after seeing the photos and explain what is needed before starting.
Do you treat bathroom leaks in Ash Sheraa buildings?
Yes, we waterproof bathrooms and treat leaks once the source is identified. Send photos of the affected area and tell us the floor so we understand the case.
What decides the cost of bitumen and membrane waterproofing?
The size of the surface, the material chosen, the condition of the surface, the number of cracks, the drain and penetration points and how easily the site can be reached. Send photos and rough dimensions on WhatsApp and tell us if old waterproofing needs to be removed, and we will recommend the right treatment.
Can gravel-faced rolls be applied over old waterproofing on an existing roof?
It depends on the condition of the old layer. If it is well bonded and free of wide blistering and cracking it may serve as a base. If it is deteriorated or blistered over large areas it must be removed first, because new waterproofing over a weak surface will not hold. Send photos of the existing roof so we can assess.
Does the surface need a levelling screed before bitumen rolls go on?
A clean, even surface free of blisters gives the waterproofing a better bond. If there are low spots where water ponds or the surface is uneven, those are corrected before the rolls go on. We read the surface condition from the photos and say what preparation is needed before the rolls are laid.
Do you offer bitumen & membrane insulation in Ash Sheraa?
Yes. Ash Sheraa is within our service area in the Eastern Province, and we also work in Ar Raja, Al Amwaj and As Sawari (near Dhahran). Call us or send photos of the spot on WhatsApp.
We also offer it in neighbouring areas
We also work near Ash Sheraa, in Ar Raja, Al Amwaj and As Sawari (near Dhahran).
More services in Ash Sheraa




