Abraj Al AzlContracting
Call العربية
Worker standing on an insulated roof beside a glass railing

Bitumen & membrane insulation in Al Uthmaniyah

Right material, right surface

Membrane, bitumen, cementitious and PVC sheet systems for roofs, foundations, tanks and bathrooms

+966 54 311 2066
The service in your area

Bitumen & membrane insulation in Al Uthmaniyah

Abraj Al Azl provides membrane and bitumen insulation in Al Uthmaniyah, starting from photos of the roof, foundation or tank sent by call or WhatsApp. The hamlet lies close to Udhailiyah, Al Matar District and the Imam Muhammed Ibn Saud Islamic University District, and the work starts by choosing the right layer for each spot.

Al Uthmaniyah is mostly houses, small villas and open roofs, and the roof is often where a problem shows first. Aged membranes crack and lift at the edges and seams, and summer sun widens those cracks over time. The photos show whether a spot needs a full new layer or a local repair, since that differs from roof to roof.

  • Al Uthmaniyah is a small village in the Al-Ahsa governorate of the Eastern Province, lying close to Udhailiyah and Al Matar District.
  • An exposed roof takes heat and sunlight all day, so the insulation layer must withstand that stress.
What the service includes

What the service covers in Al Uthmaniyah

  • Adding the right protective layer once the waterproofing has dried and cured
  • Treating cracks, the parapet, drain openings and AC bases
  • Inspecting the surface and locating leak points, cracks and joints
  • Cleaning the surface and removing deteriorated layers where needed
How we work

The steps of bitumen & membrane insulation in Al Uthmaniyah

1

Send photos of the site

On WhatsApp: photos of the roof, wall or foundation with any cracks, stains or drain outlets, so we can read the condition and choose the right material and method.

2

Prepare the surface

The surface is cleaned of dust and deposits, cracks and joints and any existing blisters are treated, and drain outlets and AC bases are prepared before anything is applied.

3

Apply the waterproof layers

The layer goes on in the way that suits the chosen material: torch welding for bitumen rolls, adhesive fixing for cold rolls, brush application for cementitious coatings or heat welding for PVC sheets. It turns up at the walls and closes around every opening.

4

Protection and finishing

The layer is left to dry and cure, then the right protective layer goes over it: gravel, mortar or tiles depending on where it is, to protect the waterproofing from heat and wear.

What sets us apart

Why Abraj Al Azl?

A continuous layer with no weak pointsProper waterproofing closes at the parapet, drain openings and AC bases, not only over the open flat area.

Your request from Al Uthmaniyah comes to usCall or WhatsApp on one number, and we answer you ourselves.

Bitumen & membrane insulation in Al UthmaniyahWe choose the method and the materials once we know the condition of the spot.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

White stepped dome on an insulated roof above a street
Two workers on the roof insulating around an AC unit
Concrete roof exposed to the sun with cracks sealed in white lines
Indoor mosaic-tiled pool
Empty garden pool during waterproofing work
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bitumen & membrane insulation in Al Uthmaniyah

Can a new layer go over old membrane in Al Uthmaniyah?

Sometimes, if the old layer is firmly bonded and free of blisters. If it is peeling or wet underneath it must come off first, and the photos will settle which applies.

Do you insulate small house roofs in Al Uthmaniyah?

Yes, we serve Al Uthmaniyah. Send photos of the roof from a few angles and tell us how many floors there are, so we can pick the right layer for that area with you.

Does the surface need a levelling screed before bitumen rolls go on?

A clean, even surface free of blisters gives the waterproofing a better bond. If there are low spots where water ponds or the surface is uneven, those are corrected before the rolls go on. We read the surface condition from the photos and say what preparation is needed before the rolls are laid.

Is Al Uthmaniyah within your service area?

Yes, Al Uthmaniyah is one of the areas we work in, as are Udhailiyah, Al Matar District and Imam Muhammed Ibn Saud Islamic University District. To start, call us or message us on WhatsApp.

Are asphalt rolls suitable for a roof that is walked on?

Asphalt rolls on a walkable roof need a protective layer over them, gravel, mortar or tiles, because direct wear and weight damage the layer over time. Without that protection the waterproofing life is shortened. We choose the protection type from the photos and how the roof is used.

What is the difference between bitumen rolls and a cementitious coating?

Bitumen rolls are a ready-made sheet that is torched or adhered to the surface and suit large roofs and foundations. Cementitious coating is a mixed material brushed or sprayed on that bonds to damp concrete, making it right for tanks, bathrooms and surfaces where rolls cannot be easily applied. Each material has its own best use.

Nearby areas

Areas near Al Uthmaniyah

If the site is outside Al Uthmaniyah, the same service is available in Udhailiyah, Al Matar District and Imam Muhammed Ibn Saud Islamic University District.

Other services in the area

More services in Al Uthmaniyah

Indoor mosaic-tiled pool

Your first step in Al Uthmaniyah:
a call or a WhatsApp message

Call us or send photos of the surface on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp