Abraj Al AzlContracting
Call العربية
Worker standing on an insulated roof beside a glass railing

Bitumen & membrane insulation in Al Mahar

Right material, right surface

Membrane, bitumen, cementitious and PVC sheet systems for roofs, foundations, tanks and bathrooms

+966 54 311 2066
The service in your area

Bitumen & membrane insulation in Al Mahar

Membrane and bitumen insulation in Al Mahar starts with a photo of the roof, foundation or basin, sent by call or WhatsApp. The district has villas and residential blocks close to Inak, Al Bustan One and Al Aqiq, and the covering method changes with the kind of surface.

Al Mahar is made up of villas and mid-sized residential buildings, each with flat roofs that need lasting protection from water. Exposed roofs take the sun all year, so membranes expand and joints open over time. For foundations and basins, bitumen or a rubber membrane suits the load and the damp. The photos show whether an old layer can be renewed or must be stripped first.

  • Al Mahar is a residential district in Dammam in the Eastern Province, close to Inak and Al Bustan One.
  • Old roll membranes usually lift at the edges and corners before any damage shows in the middle.
What the service includes

What the service covers in Al Mahar

  • Treating cracks, the parapet, drain openings and AC bases
  • Applying the waterproof layer in the material that suits the location: bitumen rolls, PVC sheet or cementitious coating
  • Cleaning the surface and removing deteriorated layers where needed
  • Closing the layer at all edges, walls and penetrations
How we work

This is how we work in Al Mahar

1

Send photos of the site

On WhatsApp: photos of the roof, wall or foundation with any cracks, stains or drain outlets, so we can read the condition and choose the right material and method.

2

Prepare the surface

The surface is cleaned of dust and deposits, cracks and joints and any existing blisters are treated, and drain outlets and AC bases are prepared before anything is applied.

3

Apply the waterproof layers

The layer goes on in the way that suits the chosen material: torch welding for bitumen rolls, adhesive fixing for cold rolls, brush application for cementitious coatings or heat welding for PVC sheets. It turns up at the walls and closes around every opening.

4

Protection and finishing

The layer is left to dry and cure, then the right protective layer goes over it: gravel, mortar or tiles depending on where it is, to protect the waterproofing from heat and wear.

What sets us apart

Why Abraj Al Azl?

A continuous layer with no weak pointsProper waterproofing closes at the parapet, drain openings and AC bases, not only over the open flat area.

Start from Al Mahar with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Your request from Al Mahar comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

White stepped dome on an insulated roof above a street
Two workers on the roof insulating around an AC unit
Concrete roof exposed to the sun with cracks sealed in white lines
Indoor mosaic-tiled pool
Empty garden pool during waterproofing work
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bitumen & membrane insulation in Al Mahar

Can new rolls be laid over an old insulation layer in Al Mahar?

In some cases, if the old layer is bonded and sound. If it has lifted or absorbed water it must come off first, and the photos will show which case applies.

What decides between bitumen and rubber membrane in Al Mahar?

The surface type, how much it moves and its sun exposure are the main factors, whether it is an exposed roof or a buried foundation. We choose after reviewing the photos and the area dimensions.

Does the surface need a levelling screed before bitumen rolls go on?

A clean, even surface free of blisters gives the waterproofing a better bond. If there are low spots where water ponds or the surface is uneven, those are corrected before the rolls go on. We read the surface condition from the photos and say what preparation is needed before the rolls are laid.

What decides the cost of bitumen and membrane waterproofing?

The size of the surface, the material chosen, the condition of the surface, the number of cracks, the drain and penetration points and how easily the site can be reached. Send photos and rough dimensions on WhatsApp and tell us if old waterproofing needs to be removed, and we will recommend the right treatment.

Can gravel-faced rolls be applied over old waterproofing on an existing roof?

It depends on the condition of the old layer. If it is well bonded and free of wide blistering and cracking it may serve as a base. If it is deteriorated or blistered over large areas it must be removed first, because new waterproofing over a weak surface will not hold. Send photos of the existing roof so we can assess.

Do you offer bitumen & membrane insulation in Al Mahar?

Yes. Al Mahar is within our service area in the Eastern Province, and we also work in Inak, Al Bustan One and Al Aqiq (near Inak). Call us or send photos of the spot on WhatsApp.

Nearby areas

The same service in nearby areas

If the site is outside Al Mahar, the same service is available in Inak, Al Bustan One and Al Aqiq (near Inak).

Other services in the area

More services in Al Mahar

Indoor mosaic-tiled pool

Bitumen & membrane insulation in Al Mahar?
Call us now

Describe the problem and where it is in Al Mahar, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp