
Bitumen & membrane insulation in Al Badi (near Al Awjam)
Bitumen and membrane insulation in Al Badi covers flat roofs, bathrooms and tank bases in houses and low-rise buildings, and it begins with photos sent to us by call or WhatsApp. Because the district mixes older houses with newer low-rise blocks, the photos help us identify which roof or wet area needs a sheet first.
Al Badi has older houses whose roofs were coated long ago, and newer low-rise buildings whose roofs may be finished differently. On older roofs, previous coatings can lift and trap water beneath, so the base must be checked before a new sheet is laid over it. Bathrooms in these buildings often sit above a flat roof or a ground slab, and the membrane needs most care where the floor meets the wall. The photos decide whether the old surface can be kept or must be prepared.
- Al Badi is a district in the Eastern Province, close to Al Badiah and Al Awjam.
- Old coatings that lift can trap water underneath, so the base is checked before a new sheet is laid.
The scope of the work in Al Badi (near Al Awjam)
- Inspecting the surface and locating leak points, cracks and joints
- Treating cracks, the parapet, drain openings and AC bases
- Applying the waterproof layer in the material that suits the location: bitumen rolls, PVC sheet or cementitious coating
- Closing the layer at all edges, walls and penetrations
The stages of the work in Al Badi (near Al Awjam)
Send photos of the site
On WhatsApp: photos of the roof, wall or foundation with any cracks, stains or drain outlets, so we can read the condition and choose the right material and method.
Prepare the surface
The surface is cleaned of dust and deposits, cracks and joints and any existing blisters are treated, and drain outlets and AC bases are prepared before anything is applied.
Apply the waterproof layers
The layer goes on in the way that suits the chosen material: torch welding for bitumen rolls, adhesive fixing for cold rolls, brush application for cementitious coatings or heat welding for PVC sheets. It turns up at the walls and closes around every opening.
Protection and finishing
The layer is left to dry and cure, then the right protective layer goes over it: gravel, mortar or tiles depending on where it is, to protect the waterproofing from heat and wear.
Why Abraj Al Azl?
A continuous layer with no weak pointsProper waterproofing closes at the parapet, drain openings and AC bases, not only over the open flat area.
Your request from Al Badi (near Al Awjam) comes to usCall or WhatsApp on one number, and we answer you ourselves.
We serve Al Badi (near Al Awjam) and around itIncluding Al Badiah, Al Awjam and Al Aujam, as part of our work across the Eastern Province.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
Questions about bitumen & membrane insulation in Al Badi (near Al Awjam)
What happens if an old roof coating has started to lift?
Lifted areas are cut back to a sound edge and the base is dried before anything new goes on. The photos show how much of the old coating has come away and whether the rest can stay.
Can a bathroom in an older Al Badi house be done alone?
Yes, a bathroom can be treated on its own when it is separate from the roof work. Photos should show the floor, the walls and the drain, so we can tell whether the membrane stops at the base of the wall or rises higher.
Do you offer bitumen & membrane insulation in Al Badi (near Al Awjam)?
Yes. Al Badi (near Al Awjam) is within our service area in the Eastern Province, and we also work in Al Badiah, Al Awjam and Al Aujam. Call us or send photos of the spot on WhatsApp.
What is membrane roll waterproofing and where is it used?
Membrane roll is a general term covering bitumen rolls, PVC rolls and composite sheets. It is used on roofs, foundations, tanks and any horizontal or vertical surface that needs a continuous waterproof sheet. The roll type is decided by the location and the degree of exposure to water and heat.
Does the surface need a levelling screed before bitumen rolls go on?
A clean, even surface free of blisters gives the waterproofing a better bond. If there are low spots where water ponds or the surface is uneven, those are corrected before the rolls go on. We read the surface condition from the photos and say what preparation is needed before the rolls are laid.
What is the difference between bitumen rolls and a cementitious coating?
Bitumen rolls are a ready-made sheet that is torched or adhered to the surface and suit large roofs and foundations. Cementitious coating is a mixed material brushed or sprayed on that bonds to damp concrete, making it right for tanks, bathrooms and surfaces where rolls cannot be easily applied. Each material has its own best use.
More services in Al Badi (near Al Awjam)




