Abraj Al AzlContracting
Call العربية
Bathroom floor and wall base brushed with a grey waterproof coat before tiling

Bathroom waterproofing in Qirhish

Sealed before the leak shows

Waterproofing bathroom and washroom floors, wall bases and drain openings, at the build stage or after tiling

+966 54 311 2066
The service in your area

Bathroom waterproofing in Qirhish

Bathroom waterproofing in Qirhish begins with photos of floor, walls and drain sent by call or WhatsApp. Qirhish is a small hamlet with simple homes, where bathrooms suffer from damp and leaks without proper protection.

Homes in Qirhish are simple with traditional designs, so bathrooms often face drainage and waterproofing challenges from age or neglect. The inland climate is relatively dry, but daily bathroom water use creates high local humidity. Concrete floors and walls absorb water readily, especially around the drain, pipes and where walls meet floor. Assessing each surface from photos helps choose the best solution for your home.

  • Qirhish is a hamlet in the Eastern Province, close to Ath Thimamah, Al Kadadiya Al Sharqiya and Ar Rabwah, with residential buildings scattered throughout.
  • In bathrooms in rural areas, cracks and damp typically appear around the drain first as it is the weakest point.
What the service includes

The main items of bathroom waterproofing in Qirhish

  • Checking the floor, wall bases, corners and the drain opening
  • Leaving the layer to cure before any finish goes over it
  • Closing the drain opening ring and the bathroom door threshold
  • Treating washroom floors and wet surfaces with the material suited to each condition
How we work

The stages of the work in Qirhish

1

Send photos of the bathroom

On WhatsApp: photos of the floor, wall bases, the drain opening, pipe entries and any visible damp, so we can read the stage and choose the right treatment.

2

Inspect and choose the treatment

The surface is checked for the condition of the render, any cracks, pipe openings and the drain. From what is found, the waterproofing material and the stage are decided.

3

Prepare the surface and treat cracks

The surface is cleaned and dried, cracks are treated, pipe openings and the drain ring are closed, and the surface is left ready to take the waterproof layer.

4

Apply the layer and let it cure

The layer covers the floor, rises at the wall bases, the corners and the door threshold, and is left to cure fully before any finish goes over it.

What sets us apart

Why Abraj Al Azl?

Protects the concrete and the reinforcementWater that reaches the reinforcement starts rust from inside, and repairing that later costs far more than waterproofing when it should be done.

Start from Qirhish with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Your request from Qirhish comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bathroom waterproofing in Qirhish

Do white damp marks on a bathroom wall in Qirhish mean a serious problem?

Not necessarily large right now, but it is a warning. Photos show where the marks are and how far they have spread, so we know whether water is entering from above, below or from the wall itself.

How long does treating a bathroom in Qirhish take?

It depends on the bathroom condition and whether it is tiled. Photos show us the size and problems so we can estimate based on that after speaking with you.

How often should a bathroom be waterproofed in a building's life?

There is no fixed interval. The layer is affected by how well it was first applied, by movement in the building, by shocks to the tiles and by changes to the plumbing. The main signal is damp patches appearing or render crumbling at the wall base, not a date. At the first sign, send us a photo.

Is kitchen waterproofing different from bathroom waterproofing?

The principle is the same: a continuous layer under the tiles around wet areas and wall bases. But the risk points in a kitchen differ: around the sink, the dishwasher connection and the floor drain, and the need is greater in kitchens above living space. Each service covers its own details separately.

Can the bathroom floor be waterproofed without lifting the tiles?

In some cases yes: if joints and cracks are limited and the tile surface is sound, sealing the joints or applying a clear waterproof coat over the tiles can work. But if the layer under the tiles is missing or the leak is advanced, lifting them is the right treatment. Send photos and we will advise.

Do you cover Qirhish?

Yes. We serve Qirhish and nearby areas such as Ath Thimamah, Al Kadadiya Al Sharqiya and Ar Rabwah (near Abqaiq), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Nearby areas

We also offer it in neighbouring areas

We also offer bathroom waterproofing in Ath Thimamah, Al Kadadiya Al Sharqiya and Ar Rabwah (near Abqaiq), among the closest areas to Qirhish.

Other services in the area

More services in Qirhish

Two workers on the roof insulating around an AC unit

Bathroom waterproofing in Qirhish?
Call us now

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp