Abraj Al AzlContracting
Call العربية
Bathroom floor and wall base brushed with a grey waterproof coat before tiling

Bathroom waterproofing in Najmah

Sealed before the leak shows

Waterproofing bathroom and washroom floors, wall bases and drain openings, at the build stage or after tiling

+966 54 311 2066
The service in your area

Bathroom waterproofing in Najmah

We provide bathroom waterproofing in the Najmah district of the Eastern Province, covering floors, wall bases and drain openings. Start by sending photos of the bathroom by call or WhatsApp so we can understand its condition before choosing a method.

Najmah has a mix of houses and villas, and many of them have several bathrooms across more than one floor. Damp in these bathrooms usually shows at wall bases and around drain openings, where an old or incomplete membrane has failed. How much work is needed depends on whether the bathroom is still at build stage or already tiled, and the photos will show which applies.

  • Najmah is a district in the Eastern Province, lying close to Radwa, Ar Rawdah and Al Andalus.
  • Most bathroom leaks begin at the floor-to-wall joint or around the drain opening.
What the service includes

The scope of the work in Najmah

  • Applying a continuous waterproof layer rising at walls and corners
  • Treating washroom floors and wet surfaces with the material suited to each condition
  • Cleaning the surface and treating hairline cracks and pipe entries
  • Checking the floor, wall bases, corners and the drain opening
How we work

The stages of the work in Najmah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, wall bases, the drain opening, pipe entries and any visible damp, so we can read the stage and choose the right treatment.

2

Inspect and choose the treatment

The surface is checked for the condition of the render, any cracks, pipe openings and the drain. From what is found, the waterproofing material and the stage are decided.

3

Prepare the surface and treat cracks

The surface is cleaned and dried, cracks are treated, pipe openings and the drain ring are closed, and the surface is left ready to take the waterproof layer.

4

Apply the layer and let it cure

The layer covers the floor, rises at the wall bases, the corners and the door threshold, and is left to cure fully before any finish goes over it.

What sets us apart

Why Abraj Al Azl?

Protects the rooms and ceiling belowA continuous layer stops water moving to the ceiling below the bathroom or to the wall of the room next to it.

We serve Najmah and around itIncluding Radwa, Ar Rawdah (near Ra's Tannurah) and Al Andalus (near Ra's Tannurah), as part of our work across the Eastern Province.

Najmah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bathroom waterproofing in Najmah

Can a tiled bathroom in Najmah be waterproofed without breaking up the floor?

That depends on the tiles and the layer beneath them. In some cases treating the joints and openings from above is enough; if the layer is damaged, the photos will show it before any decision is made.

Do you treat bathroom damp on upper floors in Najmah?

Yes, we serve Najmah. Send photos of the bathroom floor, wall bases and drain opening, and tell us the floor and current finish so we can agree the right approach.

Can the bathroom floor be waterproofed without lifting the tiles?

In some cases yes: if joints and cracks are limited and the tile surface is sound, sealing the joints or applying a clear waterproof coat over the tiles can work. But if the layer under the tiles is missing or the leak is advanced, lifting them is the right treatment. Send photos and we will advise.

Is kitchen waterproofing different from bathroom waterproofing?

The principle is the same: a continuous layer under the tiles around wet areas and wall bases. But the risk points in a kitchen differ: around the sink, the dishwasher connection and the floor drain, and the need is greater in kitchens above living space. Each service covers its own details separately.

How often should a bathroom be waterproofed in a building's life?

There is no fixed interval. The layer is affected by how well it was first applied, by movement in the building, by shocks to the tiles and by changes to the plumbing. The main signal is damp patches appearing or render crumbling at the wall base, not a date. At the first sign, send us a photo.

Do you cover Najmah?

Yes. We serve Najmah and nearby areas such as Radwa, Ar Rawdah (near Ra's Tannurah) and Al Andalus (near Ra's Tannurah), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Nearby areas

The same service in nearby areas

We also work near Najmah, in Radwa, Ar Rawdah (near Ra's Tannurah) and Al Andalus (near Ra's Tannurah).

Other services in the area

More services in Najmah

Two workers on the roof insulating around an AC unit

In Najmah and need bathroom waterproofing?
Send us photos of the spot

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp