Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in West Al Aziziyah

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in West Al Aziziyah

Bitumen bathroom waterproofing in West Al Aziziyah begins with photos sent by call or WhatsApp. The district has villas and small buildings, where bathrooms need protection before finishing with screed and tiles.

Bathrooms in villas and small buildings in West Al Aziziyah face constant humidity, and bitumen protects the concrete and base from leaks. Older villas may need surface cleaning and crack repair before bitumen, while new buildings benefit from orderly, tight waterproofing. Photos show the floor surface, walls, joints and corners before choosing how to apply it.

  • West Al Aziziyah is a district in the Eastern Province, near Al Maha, Ar Raja and Al Kawthar, with villas and small buildings.
  • A bathroom without good waterproofing exposes walls and structure to dampness and cracking over time.
What the service includes

What the service covers in West Al Aziziyah

  • Confirming full drying before the screed is poured
  • Turning the layer up the walls in the wet zone and sealing the corners
  • Applying bitumen layers over the floor including the shower area
  • Checking the concrete floor and wall bases and identifying cracks
How we work

From first contact to the finished job in West Al Aziziyah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

West Al Aziziyah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We serve West Al Aziziyah and around itIncluding Al Maha (near Dhahran), Ar Raja and Al Kawthar (near Dhahran), as part of our work across the Eastern Province.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bitumen bathroom waterproofing in West Al Aziziyah

When should a new bathroom in West Al Aziziyah be waterproofed with bitumen?

Right before any next step. After concrete is poured and the surface levelled, bitumen goes on before screed and tiles. Send photos after pouring so we see the condition.

Does bitumen protect against dampness around pipes and openings in the bathroom?

Yes, when applied tightly around all openings and joints. Photos will show us where these are so we can focus protection on them.

What should I send you from West Al Aziziyah?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in West Al Aziziyah, and we will work out the next step with you.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

Nearby areas

We also offer it in neighbouring areas

Nearby areas we also cover: Al Maha (near Dhahran), Ar Raja and Al Kawthar (near Dhahran).

Other services in the area

More services in West Al Aziziyah

Pool at night with water jets after waterproofing

Your first step in West Al Aziziyah:
a call or a WhatsApp message

Describe the problem and where it is in West Al Aziziyah, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp