
Bitumen bathroom waterproofing in Sanabis (near An Narjis One)
Bitumen bathroom waterproofing in Sanabis begins with messages containing photos of the floor and walls sent to us by call or WhatsApp. The district has houses and apartment blocks of varying ages, each with a bathroom that may need preparation before waterproofing.
Sanabis features a mix of houses and blocks of different ages, meaning bathrooms in varied conditions. An old house's bathroom may have endured years of water and dampness, while a newer building may only need bitumen applied to a clean surface. The coastal location causes moisture that can affect walls and the base, and photos help determine whether additional treatment is needed before bitumen is laid.
- Sanabis is a district in the Eastern Province, located between Al Jawharah, An Narjis One and As Sawari, with houses and residential apartment blocks.
- A bathroom in an older building often needs joints and corners repaired before bitumen application to ensure complete protection.
The bitumen bathroom waterproofing work in Sanabis (near An Narjis One)
- Checking the concrete floor and wall bases and identifying cracks
- Confirming full drying before the screed is poured
- Turning the layer up the walls in the wet zone and sealing the corners
- Applying bitumen layers over the floor including the shower area
From first contact to the finished job in Sanabis (near An Narjis One)
Send photos of the bathroom
On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.
Prepare the surface
The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.
Apply the bitumen
Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.
Screed, then tile
Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.
Why Abraj Al Azl?
A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.
We serve Sanabis (near An Narjis One) and around itIncluding Al Jawharah (near Tarout), Sanabis (near Tarout) and An Narjis One, as part of our work across the Eastern Province.
Your request from Sanabis (near An Narjis One) comes to usCall or WhatsApp on one number, and we answer you ourselves.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
أفضل شركة عزل اسطح الفوم وخزانات المياه
Real Google reviews, shown exactly as their authors wrote them.
What customers ask in Sanabis (near An Narjis One)
Can a damp bathroom in Sanabis be waterproofed with bitumen or must we wait until it dries?
The bathroom must be dry before bitumen is applied. If there is dampness or seepage, the cause must be treated first. Photos show the moisture condition and whether treatment is needed before bitumen.
What is the best way to protect a Sanabis bathroom from coastal moisture?
Bitumen provides strong protection against moisture when applied to a properly treated sound base. The coastal location means application must be thorough, and we will ensure every joint and corner is covered based on what the photos show.
How do I know the bathroom was not properly waterproofed before?
Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.
What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?
Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.
Why does bitumen need screed over it before tiling?
Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.
Do you cover Sanabis (near An Narjis One)?
Yes. We serve Sanabis (near An Narjis One) and nearby areas such as Al Jawharah (near Tarout), Sanabis (near Tarout) and An Narjis One, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.
Bitumen bathroom waterproofing near Sanabis (near An Narjis One)
We also work near Sanabis (near An Narjis One), in Al Jawharah (near Tarout), Sanabis (near Tarout) and An Narjis One.
More services in Sanabis (near An Narjis One)




