Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Prince Naif

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Prince Naif

Bitumen bathroom waterproofing in Prince Naif begins with photos of the floor and lower walls, sent by call or WhatsApp. The district has villas and residential blocks, and bathrooms in these buildings need effective waterproofing before tiling and screed are laid.

Bathrooms in Prince Naif vary between those in newly built villas and others in residential blocks, and some bathrooms on upper floors allow damp to affect ceilings below. Bitumen protects concrete from water seepage before ceramic is applied, preventing moisture from spreading to adjoining walls and ceilings. Humidity levels depend on where the bathroom is and how well it ventilates, and the photos show the surface condition and any cracks before waterproofing begins.

  • Prince Naif is a residential district in the Eastern Province, close to Al Amal and Ar Rawdah, with villas and apartment blocks.
  • A bathroom on an upper floor of a block needs strong waterproofing to prevent water leaking into the flat below.
What the service includes

What we do for you in Prince Naif

  • Checking the concrete floor and wall bases and identifying cracks
  • Confirming full drying before the screed is poured
  • Applying bitumen layers over the floor including the shower area
  • Cleaning the surface and treating cracks and corners before application
How we work

The steps of bitumen bathroom waterproofing in Prince Naif

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Your request from Prince Naif comes to usCall or WhatsApp on one number, and we answer you ourselves.

Bitumen bathroom waterproofing in Prince NaifWe choose the method and the materials once we know the condition of the spot.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bitumen bathroom waterproofing in Prince Naif

Should a villa bathroom be waterproofed before screed is laid?

Yes, bitumen is applied directly to concrete before tiling and flooring, protecting the structure underneath. Send photos of the floor and lower walls so we can assess the surface condition.

Is bitumen alone enough for a bathroom in a residential block?

Bitumen forms an essential waterproofing layer before tiling. However, the outcome depends on the concrete condition and existing cracks, and the photos will show whether any additional treatment is needed before waterproofing.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Do you cover Prince Naif?

Yes. We serve Prince Naif and nearby areas such as Al Amal (near Al Khafji), Ar Rawdah (near Al Khafji) and King Fahd, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: Al Amal (near Al Khafji), Ar Rawdah (near Al Khafji) and King Fahd.

Other services in the area

More services in Prince Naif

Pool at night with water jets after waterproofing

Your first step in Prince Naif:
a call or a WhatsApp message

Describe the problem and where it is in Prince Naif, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp