Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Ohod

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Ohod

Bitumen bathroom waterproofing in Ohod begins with a photo of the bathroom and its floor, sent by call or WhatsApp. The district has standalone houses and villas, and its bathroom floors are prepared with bitumen before the screed and tiling.

Bathrooms in Ohod's standalone houses are often on the ground floor or on an upper floor next to an open roof, and both need careful floor protection. Bitumen goes on the floor and the lower walls before the screed, so water cannot pass through the tiles into the layers below. In bathrooms built some time ago, joints and cracks appear around pipe outlets, and the photos show what needs repair first.

  • Ohod is a district in Dammam in the Eastern Province, near Ad Dabab, Badr and An Noor.
  • Pipe outlets in a bathroom are where cracks most often open up over time.
What the service includes

What we do for you in Ohod

  • Cleaning the surface and treating cracks and corners before application
  • Checking the concrete floor and wall bases and identifying cracks
  • Applying bitumen layers over the floor including the shower area
  • Turning the layer up the walls in the wet zone and sealing the corners
How we work

The stages of the work in Ohod

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Ohod is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Your request from Ohod comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Ohod

Can a bathroom in a standalone villa in Ohod be waterproofed with bitumen?

Yes, if the floor is sound and needs protection before screeding. Send photos of the bathroom so we can determine together whether the membrane alone is enough or cracks must be treated first.

What changes if the bathroom is on an upper floor in Ohod?

An upper-floor bathroom needs its ceiling below checked, since leakage there shows up in the storey beneath. The photos show the bathroom's position and whether the protection is sufficient.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Is Ohod within your service area?

Yes, Ohod is one of the areas we work in, as are Ad Dabab (near Al Athir), Badr and An Noor (near Ohod). To start, call us or message us on WhatsApp.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

Nearby areas

We also offer it in neighbouring areas

If the site is outside Ohod, the same service is available in Ad Dabab (near Al Athir), Badr and An Noor (near Ohod).

Other services in the area

More services in Ohod

Pool at night with water jets after waterproofing

In Ohod and need bitumen bathroom waterproofing?
Send us photos of the spot

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp