Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Muraytibah

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Muraytibah

Bitumen bathroom waterproofing in Muraytibah starts with WhatsApp photos of the floor and walls. The hamlet has small houses and villas on scattered plots, and bathrooms need protection from damp before flooring and tiles are laid.

Bathrooms in houses and villas across Muraytibah vary in size and layout, and many are old or undergoing renovation. Bitumen is applied to the floor and wall base before concrete and tiles are laid, to prevent water leaking from pipes, showers and sinks. Photos show the wall and floor condition and whether there are old cracks or damp, so we choose the right thickness and method for each case.

  • Muraytibah is a hamlet near Sudah, Al Ghuwaybah and At Taraf, with houses and villas on scattered plots in the Eastern Province.
  • A bathroom in a house or villa is exposed to daily moisture from showers and sinks, so bitumen must be applied before any construction above it.
What the service includes

The main items of bitumen bathroom waterproofing in Muraytibah

  • Applying bitumen layers over the floor including the shower area
  • Turning the layer up the walls in the wet zone and sealing the corners
  • Closing the waterproofing around drain openings and pipe entries
  • Checking the concrete floor and wall bases and identifying cracks
How we work

This is how we work in Muraytibah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

We serve Muraytibah and around itIncluding Sudah, Al Ghuwaybah and At Taraf, as part of our work across the Eastern Province.

Muraytibah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Muraytibah

Is bitumen enough for an old leaking bathroom?

If the floor and walls are structurally sound, yes. But if there are deep cracks or crumbling, the photos will show it and repair may be needed before waterproofing.

How do we start a bitumen bathroom waterproofing job in Muraytibah?

Send clear photos of the floor, walls and corners via WhatsApp or call us, and tell us whether the bathroom is new or old so we can decide what suits it.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

Is Muraytibah within your service area?

Yes, Muraytibah is one of the areas we work in, as are Sudah, Al Ghuwaybah and At Taraf. To start, call us or message us on WhatsApp.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Nearby areas

The same service in nearby areas

We also work near Muraytibah, in Sudah, Al Ghuwaybah and At Taraf.

Other services in the area

More services in Muraytibah

Pool at night with water jets after waterproofing

We start with you in Muraytibah
with one call

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp