Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Industrial (near Hafar Al-Batin)

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Industrial (near Hafar Al-Batin)

Bitumen waterproofing for bathrooms in industrial buildings in the Industrial area begins with photos sent by WhatsApp or call. The area has factories, workshops and warehouses, and worker bathrooms face seepage risk from the industrial setting, so they need strong protection.

The Industrial area has various metal and concrete buildings, some old and some new, with simple worker bathrooms that may be attached to the main building or separate. Seepage and damp in an industrial bathroom can come from the ground floor, shared drainage or spray and cleaning. Bitumen before screed and tile protects concrete from continuous water and light chemicals, and each industrial building is different, so photos determine the best solution.

  • Industrial is a district in the Eastern Province, close to Ar Rawdah, Al Fayha and Ar Rabie.
  • Industrial building bathrooms face repeated water and daily spray, so bitumen must withstand heavy use and frequent cleaning.
What the service includes

The main items of bitumen bathroom waterproofing in Industrial (near Hafar Al-Batin)

  • Cleaning the surface and treating cracks and corners before application
  • Checking the concrete floor and wall bases and identifying cracks
  • Closing the waterproofing around drain openings and pipe entries
  • Confirming full drying before the screed is poured
How we work

From first contact to the finished job in Industrial (near Hafar Al-Batin)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Industrial (near Hafar Al-Batin) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We serve Industrial (near Hafar Al-Batin) and around itIncluding Ar Rawdah (near Hafar Al-Batin), Al Fayha (near Hafar Al-Batin) and Ar Rabie (near Hafar Al-Batin), as part of our work across the Eastern Province.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bitumen bathroom waterproofing in Industrial (near Hafar Al-Batin)

Can we waterproof a simple factory bathroom without removing the current floor bonded with old bitumen?

If the old bitumen is still strong and bonded we may apply a new layer over it, but if it is damaged or lifting it must be removed first. Send photos so we can see the surface condition and work with you on whether removal is needed.

Can bitumen withstand chemical spray and daily cleaning in a factory bathroom?

Standard bitumen handles water and cleaning, but strong chemicals may damage it. Tell us what cleaning chemicals you use so we can decide if you need an extra protective layer over the bitumen.

Is Industrial (near Hafar Al-Batin) within your service area?

Yes, Industrial (near Hafar Al-Batin) is one of the areas we work in, as are Ar Rawdah (near Hafar Al-Batin), Al Fayha (near Hafar Al-Batin) and Ar Rabie (near Hafar Al-Batin). To start, call us or message us on WhatsApp.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: Ar Rawdah (near Hafar Al-Batin), Al Fayha (near Hafar Al-Batin) and Ar Rabie (near Hafar Al-Batin).

Other services in the area

More services in Industrial (near Hafar Al-Batin)

Pool at night with water jets after waterproofing

Bitumen bathroom waterproofing in Industrial (near Hafar Al-Batin)?
Call us now

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp