Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Hazm

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Hazm

Bitumen bathroom waterproofing in Hazm starts with photos of the bathroom floor and walls, sent by call or WhatsApp. The district has varied homes and villas, each needing moisture protection before tiling.

Hazm is a residential district with villas and apartment buildings, their bathrooms exposed daily to water and steam from showers and use. Floors and wall bases, especially around pipes and drains, are prone to leaks without waterproofing before tiling. Bitumen is applied to clean, dry surfaces and forms a thick, solid barrier. Photos help us see the surface condition and the area to be protected.

  • Hazm is a district in the Eastern Province, close to Safwa and Al Urubah, with medium-sized homes and villas.
  • A residential bathroom receives water and steam continuously, and bitumen waterproofing before tiling is essential for lasting protection.
What the service includes

The scope of the work in Hazm

  • Confirming full drying before the screed is poured
  • Applying bitumen layers over the floor including the shower area
  • Cleaning the surface and treating cracks and corners before application
  • Closing the waterproofing around drain openings and pipe entries
How we work

This is how we work in Hazm

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Hazm is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Bitumen bathroom waterproofing in HazmWe choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bitumen bathroom waterproofing in Hazm

How does bitumen waterproofing differ between an old and a new bathroom?

An old bathroom may have small cracks in the floor and walls needing repair before bitumen, while a new one needs only cleaning and drying. Photos show us the surface condition to determine what is needed first.

Can a bathroom in an old villa in Hazm be waterproofed without removing the old tiles?

If old tiles are removed, the concrete surface can be properly sealed; with existing tiles, effective waterproofing is not possible. Send photos so we can see the tile condition and what is underneath.

Do you cover Hazm?

Yes. We serve Hazm and nearby areas such as Safwa, Al Urubah (near Safwa) and Al Marwah, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Nearby areas

We also offer it in neighbouring areas

We also work near Hazm, in Safwa, Al Urubah (near Safwa) and Al Marwah.

Other services in the area

More services in Hazm

Pool at night with water jets after waterproofing

Your first step in Hazm:
a call or a WhatsApp message

Call us or send photos of the floor, the pipe entries and the wall bases on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp