Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Dhahran

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Dhahran

Bitumen bathroom waterproofing in Dhahran starts with a photo or call to understand the floor and wall condition. The city has older residential compounds and modern buildings, with bathrooms ranging from tight units in apartment blocks to spacious ones in villas. Bitumen creates a moisture barrier before screed and tiling go down.

Bathrooms in Dhahran face daily moisture from use and showers, especially where ventilation is limited. In older apartment blocks, floors and base walls may be untreated, allowing water to seep through fine cracks and joints. Newer bathrooms may need the barrier renewed when being refitted. Bitumen is laid before screed and tiling to stop water pooling beneath the surface, and photos show which details in your bathroom need attention.

  • Dhahran is a city in the Eastern Province near Dammam and Al Khobar, with residential compounds of varied age and size.
  • An enclosed bathroom traps moisture, so waterproofing must start at the floor and base walls before any finishing.
What the service includes

What we do for you in Dhahran

  • Turning the layer up the walls in the wet zone and sealing the corners
  • Cleaning the surface and treating cracks and corners before application
  • Checking the concrete floor and wall bases and identifying cracks
  • Confirming full drying before the screed is poured
How we work

This is how we work in Dhahran

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Dhahran is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Start from Dhahran with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bitumen bathroom waterproofing in Dhahran

Must old tiles be removed before bitumen waterproofing is applied?

It depends on the surface condition. If the floor is sound and uncracked, work can go straight over it; if it is damaged or water is leaking from beneath, the photos will show that and we will tell you what is needed.

How long does bitumen waterproofing take in a Dhahran bathroom before tiling?

The duration depends on the bathroom size, surface condition, and layers needed. The photos you send will help us estimate the steps with you before starting.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

How do I request bitumen bathroom waterproofing in Dhahran?

Call us, or send clear photos of the spot and its location in Dhahran on WhatsApp, and we will work out the next step with you.

Nearby areas

Bitumen bathroom waterproofing near Dhahran

If the site is outside Dhahran, the same service is available in Gharb Adh Dhahran, King Fahd University of Petroleum and Minerals and Ad Danah Al Janubiyah.

Other services in the area

More services in Dhahran

Pool at night with water jets after waterproofing

Bitumen bathroom waterproofing in Dhahran?
Call us now

Call us or send photos of the floor, the pipe entries and the wall bases on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp