Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Az Zuhur (near Dammam)

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Az Zuhur (near Dammam)

Bitumen bathroom waterproofing in Az Zuhur begins with WhatsApp messages containing photos of the floor and lower walls. Az Zuhur has homes and villas of mixed ages, some with leaking or damp bathrooms from the foundation or pipework.

Homes in Az Zuhur range from old through medium to new, and older bathrooms often show worn bitumen or floor cracks. Foundation dampness is common in the area and may leave the floor wet or tiles loose. Fresh bitumen stops soil water from rising and protects concrete from decay. The layer may need reinforcement depending on seepage size and foundation depth beneath the bathroom, shown in the photos.

  • Az Zuhur is a district in the Eastern Province near Al Khalij, As Salam and Al Hamra, containing residential homes and villas.
  • A bathroom in an older home or villa may need old, worn bitumen removed and a fresh, reliable layer applied.
What the service includes

The main items of bitumen bathroom waterproofing in Az Zuhur (near Dammam)

  • Checking the concrete floor and wall bases and identifying cracks
  • Confirming full drying before the screed is poured
  • Cleaning the surface and treating cracks and corners before application
  • Applying bitumen layers over the floor including the shower area
How we work

The stages of the work in Az Zuhur (near Dammam)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Start from Az Zuhur (near Dammam) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We serve Az Zuhur (near Dammam) and around itIncluding Al Khalij (near Dammam), As Salam (near Dammam) and Al Hamra (near Dammam), as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bitumen bathroom waterproofing in Az Zuhur (near Dammam)

Can bitumen be renewed in an older bathroom without removing the tiles?

If the floor beneath tiles is sound we may apply a fresh layer, but if moisture is severe or tiles loose we may need full tile removal and cleaning first. Photos help us understand the case.

Does bitumen last long in a heavily used bathroom?

Properly applied bitumen lasts many years. Heavy use and constant moisture may shorten its lifespan, so the layer must be thick and carefully placed. Your photos tell us what is needed.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

Is Az Zuhur (near Dammam) within your service area?

Yes, Az Zuhur (near Dammam) is one of the areas we work in, as are Al Khalij (near Dammam), As Salam (near Dammam) and Al Hamra (near Dammam). To start, call us or message us on WhatsApp.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Nearby areas

Areas near Az Zuhur (near Dammam)

We also work near Az Zuhur (near Dammam), in Al Khalij (near Dammam), As Salam (near Dammam) and Al Hamra (near Dammam).

Other services in the area

More services in Az Zuhur (near Dammam)

Pool at night with water jets after waterproofing

In Az Zuhur (near Dammam) and need bitumen bathroom waterproofing?
Send us photos of the spot

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp