Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Az Zahra

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Az Zahra

In Az Zahra in the Eastern Province we waterproof bathrooms with bitumen before laying the screed and tiles, starting from photos sent by call or WhatsApp. Our aim is to keep water away from the concrete beneath the floor.

Az Zahra consists of residential neighbourhoods of villas and small buildings of differing age, and bathrooms on the ground floor often sit directly on a slab. As time passes the screed can crack and let water reach the slab, sometimes showing up as damp on the opposite wall. The photos reveal how far the damage goes and where it is, so we know whether waterproofing alone is enough or repair must come first.

  • Az Zahra is a residential district of Dammam in the Eastern Province, close to Al Jawahir, Al Wurud and An Narjis.
  • A cracked screed lets water reach the slab, so its effect can show well away from the leak point.
What the service includes

What the service covers in Az Zahra

  • Turning the layer up the walls in the wet zone and sealing the corners
  • Confirming full drying before the screed is poured
  • Cleaning the surface and treating cracks and corners before application
  • Checking the concrete floor and wall bases and identifying cracks
How we work

The stages of the work in Az Zahra

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

We serve Az Zahra and around itIncluding Al Jawahir, Al Wurud (near Tarout) and An Narjis, as part of our work across the Eastern Province.

Your request from Az Zahra comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bitumen bathroom waterproofing in Az Zahra

Is waterproofing enough if a bathroom screed in Az Zahra has cracked?

Usually the cracks need repairing first and waterproofing goes on top. The photos show whether the cracks are surface-level or reach the slab.

How can I tell if damp in Az Zahra comes from the bathroom?

Send photos of the damp wall together with the bathroom beside it. If the mark sits directly below the bathroom, the source is likely there; otherwise we will suggest a different check.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Is Az Zahra within your service area?

Yes, Az Zahra is one of the areas we work in, as are Al Jawahir, Al Wurud (near Tarout) and An Narjis. To start, call us or message us on WhatsApp.

Nearby areas

Areas near Az Zahra

If the site is outside Az Zahra, the same service is available in Al Jawahir, Al Wurud (near Tarout) and An Narjis.

Other services in the area

More services in Az Zahra

Pool at night with water jets after waterproofing

Tell us about your site in Az Zahra
and we will plan the next step with you

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp