
Bitumen bathroom waterproofing in Ath Thimamah
Bitumen bathroom waterproofing in Ath Thimamah begins with photos or video via WhatsApp or phone. The hamlet has scattered houses and villas on rural land, with bathrooms needing damp protection before tiles and screed.
Ath Thimamah is rural with buildings varying in age and construction, bathrooms exposed to damp especially in rainy seasons. Bitumen creates a water barrier beneath floors and walls, protecting the house from water seeping into foundations and adjacent walls. Some houses are older and their concrete may need light cleaning and repair before the waterproof layer is applied. Photos reflect the bathroom's actual state and help us choose the right method and material.
- Ath Thimamah is a small rural hamlet in the Eastern Province near Qirhish, Al Kidadiyah and Fudah.
- Bathrooms in rural areas face ground damp and rain, so they need strong waterproofing on the floor and joints.
What the service covers in Ath Thimamah
- Confirming full drying before the screed is poured
- Turning the layer up the walls in the wet zone and sealing the corners
- Cleaning the surface and treating cracks and corners before application
- Applying bitumen layers over the floor including the shower area
The stages of the work in Ath Thimamah
Send photos of the bathroom
On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.
Prepare the surface
The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.
Apply the bitumen
Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.
Screed, then tile
Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.
Why Abraj Al Azl?
Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.
Ath Thimamah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
Bitumen bathroom waterproofing in Ath ThimamahWe choose the method and the materials once we know the condition of the spot.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
أفضل شركة عزل اسطح الفوم وخزانات المياه
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Before you book bitumen bathroom waterproofing in Ath Thimamah
Can an old bathroom be waterproofed before retiling it?
Yes, the old floor is cleaned and repaired if needed, then bitumen is applied. Your photos will show whether the concrete is in good condition or needs prior repair.
Does bitumen protect against ground damp beneath the bathroom?
Bitumen forms an effective barrier, but in areas with high ground damp, additional treatment may be needed. Photos help us assess damp levels and suggest the right solution.
What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?
Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.
Do you offer bitumen bathroom waterproofing in Ath Thimamah?
Yes. Ath Thimamah is within our service area in the Eastern Province, and we also work in Qirhish, Al Kidadiyah (near Ayn Dar) and Fudah. Call us or send photos of the spot on WhatsApp.
What decides the cost of bitumen waterproofing for a bathroom?
The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.
Why does bitumen need screed over it before tiling?
Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.
Areas near Ath Thimamah
Nearby areas we also cover: Qirhish, Al Kidadiyah (near Ayn Dar) and Fudah.
More services in Ath Thimamah




