Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in As Sulaimaniyah District

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in As Sulaimaniyah District

Bitumen bathroom waterproofing in As Sulaimaniyah begins with photos of the bathroom floor and wall bases, sent by call or WhatsApp. The district sits in central Hofuf near An Nasriyah, Ayn Musa and the historical centre.

The district combines traditional houses with newer homes on closely packed lanes, and its bathrooms are often built with tightly joined concrete walls and floors. In older houses damp usually shows where the floor meets the wall and around the drain, and old layers may be uneven and need levelling before lining. The choice follows from the photos and the condition of the layers.

  • As Sulaimaniyah is a district in Hofuf, Al-Ahsa, in the Eastern Province, close to An Nasriyah, Ayn Musa and the historical centre.
  • Uneven old floors need levelling before any waterproofing layer so that it bonds properly.
What the service includes

What the service covers in As Sulaimaniyah District

  • Closing the waterproofing around drain openings and pipe entries
  • Checking the concrete floor and wall bases and identifying cracks
  • Applying bitumen layers over the floor including the shower area
  • Cleaning the surface and treating cracks and corners before application
How we work

From first contact to the finished job in As Sulaimaniyah District

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

We serve As Sulaimaniyah District and around itIncluding An Nasriyah District, Ayn Musa District and Historical Center Hafuf District, as part of our work across the Eastern Province.

Your request from As Sulaimaniyah District comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bitumen bathroom waterproofing in As Sulaimaniyah District

Are older floors in As Sulaimaniyah suitable for bitumen lining?

Usually yes, once they are levelled and any loose parts removed. The photos and the surface condition will show whether treatment is enough or deeper preparation is needed.

Are the wall corners in As Sulaimaniyah bathrooms waterproofed?

Yes, wall bases and corners are key points because water often gets in there. Send photos so the condition is clear before the scope is set.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

What should I send you from As Sulaimaniyah District?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in As Sulaimaniyah District, and we will work out the next step with you.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: An Nasriyah District, Ayn Musa District and Historical Center Hafuf District.

Other services in the area

More services in As Sulaimaniyah District

Pool at night with water jets after waterproofing

Tell us about your site in As Sulaimaniyah District
and we will plan the next step with you

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp