Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Ar Rabie (near Qaryah al Ulya)

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Ar Rabie (near Qaryah al Ulya)

Bitumen waterproofing for bathrooms in Ar Rabie begins by sending photos of the bathroom floor and lower walls by call or WhatsApp. The district has varied villas and houses where the bathroom may need new waterproofing or leakage treatment before tiling.

Villas and houses in Ar Rabie vary in construction and age, and a bathroom may be part of a new addition or the original build. Seepage from the bathroom affects neighbouring rooms and basements if present, so bitumen waterproofing prevents this from the start. We assess photos to see if there are concrete cracks, weak joints or old pipes needing treatment before new waterproofing.

  • Ar Rabie is a district in the Eastern Province near Ar Rabwah, Ar Rawdah and Qaryah al Ulya, with varied villas and houses.
  • A bathroom in a villa exposes walls and foundation to constant water, and bitumen is an effective barrier protecting the structure from deep seepage.
What the service includes

The main items of bitumen bathroom waterproofing in Ar Rabie (near Qaryah al Ulya)

  • Cleaning the surface and treating cracks and corners before application
  • Confirming full drying before the screed is poured
  • Checking the concrete floor and wall bases and identifying cracks
  • Turning the layer up the walls in the wet zone and sealing the corners
How we work

The stages of the work in Ar Rabie (near Qaryah al Ulya)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Bitumen bathroom waterproofing in Ar Rabie (near Qaryah al Ulya)We choose the method and the materials once we know the condition of the spot.

Your request from Ar Rabie (near Qaryah al Ulya) comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bitumen bathroom waterproofing in Ar Rabie (near Qaryah al Ulya)

Must old tiles be removed before bitumen waterproofing the bathroom?

Yes, old tiles and bitumen must be removed to reach the concrete. Then we repair the concrete and apply new bitumen before new tiles go down.

Can leakage still occur from a waterproofed bathroom into the ground below?

Bitumen protects the concrete, but if leakage is from a buried pipe it must be fixed first. Photos and testing show where any seepage is coming from before waterproofing.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Do you cover Ar Rabie (near Qaryah al Ulya)?

Yes. We serve Ar Rabie (near Qaryah al Ulya) and nearby areas such as Ar Rabwah (near Qaryah al Ulya), Ar Rawdah (near Qaryah al Ulya) and Qaryah al Ulya, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Nearby areas

Bitumen bathroom waterproofing near Ar Rabie (near Qaryah al Ulya)

We also work near Ar Rabie (near Qaryah al Ulya), in Ar Rabwah (near Qaryah al Ulya), Ar Rawdah (near Qaryah al Ulya) and Qaryah al Ulya.

Other services in the area

More services in Ar Rabie (near Qaryah al Ulya)

Pool at night with water jets after waterproofing

In Ar Rabie (near Qaryah al Ulya) and need bitumen bathroom waterproofing?
Send us photos of the spot

Describe the problem and where it is in Ar Rabie (near Qaryah al Ulya), and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp