
Bitumen bathroom waterproofing in Al Yarmok (near Al Khobar)
In Al Yarmok we waterproof bathroom floors and wall bases with bitumen before the screed and tiles. We begin with photos of the bathroom, sent by call or WhatsApp.
The district is made of mid-sized residential buildings and apartments that share drainage, with many bathrooms in flats that back onto each other. Leaks in these bathrooms often appear where the floor meets the wall or around drain outlets. Bitumen goes onto the floor and wall base before tiling and needs a clean, dry surface. The photos show whether your case suits this treatment.
- Al Yarmok is a residential district in the Eastern Province, near Al Bandariyah, Al Kurnaish and Al Bustan.
- Drain outlets and their edges are hard points to seal in small bathrooms.
What we do for you in Al Yarmok (near Al Khobar)
- Applying bitumen layers over the floor including the shower area
- Turning the layer up the walls in the wet zone and sealing the corners
- Confirming full drying before the screed is poured
- Closing the waterproofing around drain openings and pipe entries
This is how we work in Al Yarmok (near Al Khobar)
Send photos of the bathroom
On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.
Prepare the surface
The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.
Apply the bitumen
Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.
Screed, then tile
Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.
Why Abraj Al Azl?
A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.
We serve Al Yarmok (near Al Khobar) and around itIncluding Al Bandariyah, Al Kurnaish and Al Bustan (near Al Khobar), as part of our work across the Eastern Province.
Bitumen bathroom waterproofing in Al Yarmok (near Al Khobar)We choose the method and the materials once we know the condition of the spot.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
أفضل شركة عزل اسطح الفوم وخزانات المياه
Real Google reviews, shown exactly as their authors wrote them.
What customers ask in Al Yarmok (near Al Khobar)
Is the area around the drain outlet in Al Yarmok waterproofed?
Yes, the drain edges are part of the work before tiling. We locate the outlet from the photos and treat it together with the floor.
Does the work differ in flat bathrooms with shared walls?
The work itself is the same, but the shared wall needs careful checking. Send photos of the wall so we can tell whether the leak comes from next door.
How do I know the bathroom was not properly waterproofed before?
Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.
What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?
Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.
Do you offer bitumen bathroom waterproofing in Al Yarmok (near Al Khobar)?
Yes. Al Yarmok (near Al Khobar) is within our service area in the Eastern Province, and we also work in Al Bandariyah, Al Kurnaish and Al Bustan (near Al Khobar). Call us or send photos of the spot on WhatsApp.
Is bitumen right for bathroom walls as well as the floor?
Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.
We also offer it in neighbouring areas
Nearby areas we also cover: Al Bandariyah, Al Kurnaish and Al Bustan (near Al Khobar).
More services in Al Yarmok (near Al Khobar)




