Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Yaqoot

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Yaqoot

Bitumen bathroom waterproofing in Al Yaqoot starts with photos of the floor and walls sent by call or WhatsApp. Bitumen protects the surface from water before tiling and screed go down.

Al Yaqoot is a residential district with villas and small apartment blocks, and its bathrooms vary in size and age. An older bathroom may show damp around the base and in corners before rebuilding, while a new one needs proper waterproofing from the start to prevent later seepage. Bitumen must cover the entire floor and the wall base to a set height, and the photos show the surface condition and whether there are cracks or weak spots needing treatment first.

  • Al Yaqoot is a district in the Eastern Province close to Jarudiyah and Al Badiah, with villas and residential apartment blocks.
  • A new bathroom needs tight waterproofing before construction, and an older one may need the base repaired first before bitumen is applied.
What the service includes

What the service covers in Al Yaqoot

  • Turning the layer up the walls in the wet zone and sealing the corners
  • Applying bitumen layers over the floor including the shower area
  • Closing the waterproofing around drain openings and pipe entries
  • Cleaning the surface and treating cracks and corners before application
How we work

The steps of bitumen bathroom waterproofing in Al Yaqoot

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Al Yaqoot is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Bitumen bathroom waterproofing in Al YaqootWe choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Yaqoot

Can an old bathroom in Al Yaqoot be waterproofed without replacing the base?

If the surface is sound and free of large cracks, yes. We repair small cracks and weak spots then apply bitumen. The photos will show us the base condition and we will tell you if replacement is needed.

How thick should bitumen be in an Al Yaqoot bathroom?

Thickness depends on the surface condition and use. The photos and phone assessment will help us set the right thickness to ensure full protection from water.

Do you offer bitumen bathroom waterproofing in Al Yaqoot?

Yes. Al Yaqoot is within our service area in the Eastern Province, and we also work in Jarudiyah (near Qatif), Al Badiah and Al Jarudiyah (near Imhaish). Call us or send photos of the spot on WhatsApp.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Nearby areas

The same service in nearby areas

If the site is outside Al Yaqoot, the same service is available in Jarudiyah (near Qatif), Al Badiah and Al Jarudiyah (near Imhaish).

Other services in the area

More services in Al Yaqoot

Pool at night with water jets after waterproofing

In Al Yaqoot and need bitumen bathroom waterproofing?
Send us photos of the spot

Call us or send photos of the floor, the pipe entries and the wall bases on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp