
Bitumen bathroom waterproofing in Al Wahah (near Ghizlan)
Bitumen bathroom waterproofing in Al Wahah starts with WhatsApp photos of the floor, walls and corners before screed and construction begins. Al Wahah has villas and small residential buildings where bathrooms are vulnerable to moisture and foundation leaks.
Al Wahah consists of villas and small to medium residential buildings, all with bathrooms needing bitumen waterproofing before finishing. Bitumen protects concrete from water and vapour absorption, preventing leaks into lower layers and walls. Smaller bathrooms especially suffer from moisture buildup, and corners and joints are most at risk of seeping. Photos show the floor and wall condition and help us define the scope and method.
- Al Wahah is a residential district in the Eastern Province, near Al Dabab, Al Tawyah and Al Dana.
- A small bathroom in a house or villa traps vapour and moisture more easily, so bitumen waterproofing must carefully cover all the floor and lower walls.
The bitumen bathroom waterproofing work in Al Wahah (near Ghizlan)
- Closing the waterproofing around drain openings and pipe entries
- Confirming full drying before the screed is poured
- Cleaning the surface and treating cracks and corners before application
- Applying bitumen layers over the floor including the shower area
How we carry out bitumen bathroom waterproofing in Al Wahah (near Ghizlan)
Send photos of the bathroom
On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.
Prepare the surface
The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.
Apply the bitumen
Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.
Screed, then tile
Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.
Why Abraj Al Azl?
A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.
We serve Al Wahah (near Ghizlan) and around itIncluding Al Dabab (near Ghizlan), Al Tawyah and Al Dana (near Ghizlan), as part of our work across the Eastern Province.
Al Wahah (near Ghizlan) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
Your questions on bitumen bathroom waterproofing in Al Wahah (near Ghizlan)
Must every bathroom in Al Wahah be waterproofed with bitumen, or only older ones?
Every new or under-construction bathroom should have bitumen waterproofing before screed and tiles, because water and vapour attack any bathroom over time. Photos show whether waterproofing was already done.
Do you treat old bathroom leaks in Al Wahah before applying new bitumen?
Yes, damaged cracks and joints are repaired first, then bitumen is applied. Photos reveal the source and extent of the leak, and we tell you what steps are needed.
Is bitumen right for bathroom walls as well as the floor?
Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.
What should I send you from Al Wahah (near Ghizlan)?
Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Wahah (near Ghizlan), and we will work out the next step with you.
Does the bathroom need ventilation while bitumen is applied?
Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.
How do I know the bathroom was not properly waterproofed before?
Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.
We also offer it in neighbouring areas
Nearby areas we also cover: Al Dabab (near Ghizlan), Al Tawyah and Al Dana (near Ghizlan).
More services in Al Wahah (near Ghizlan)




