Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in AL THIYBIA

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in AL THIYBIA

Bitumen waterproofing for bathrooms in Al Thiybia begins with photos of the floor and lower walls sent via WhatsApp or call. The town has residential buildings and family houses of varying age and construction, which affects how much damp each bathroom holds.

Al Thiybia consists of small to medium residential buildings, and many of its bathrooms were built with bare concrete foundations and no original waterproof layer. Damp appears under tiles or on outer walls after years of use, especially in cooler months when temperature swings are large. Bitumen goes down before the screed and tiles to create a barrier stopping water reaching the concrete, and photos show whether treating cracks first is necessary.

  • Al Thiybia is a town in the Eastern Province, close to Al Fiwan, King Khālid Military City and Ash Shifa.
  • Unsealed bathroom foundation concrete absorbs water slowly, accumulating damp over the years.
What the service includes

What we do for you in AL THIYBIA

  • Applying bitumen layers over the floor including the shower area
  • Closing the waterproofing around drain openings and pipe entries
  • Cleaning the surface and treating cracks and corners before application
  • Turning the layer up the walls in the wet zone and sealing the corners
How we work

From first contact to the finished job in AL THIYBIA

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Start from AL THIYBIA with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Your request from AL THIYBIA comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bitumen bathroom waterproofing in AL THIYBIA

Does bitumen bathroom waterproofing mean removing the old tiles?

Yes, the old tiles and screed must be lifted to reach the base concrete, then bitumen is laid before new tiles. Photos show the concrete's condition underneath as soon as it is removed.

Does a Thiybia bathroom need one bitumen layer or more?

It depends on how severe the damp is, the concrete's condition and the surrounding water. Send photos of the bathroom and neighbouring walls so we can decide together how many layers are needed.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Do you cover AL THIYBIA?

Yes. We serve AL THIYBIA and nearby areas such as Al Fiwan, King Khālid Military City and Ash Shifa (near Hafar Al-Batin), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Nearby areas

Areas near AL THIYBIA

If the site is outside AL THIYBIA, the same service is available in Al Fiwan, King Khālid Military City and Ash Shifa (near Hafar Al-Batin).

Other services in the area

More services in AL THIYBIA

Pool at night with water jets after waterproofing

Tell us about your site in AL THIYBIA
and we will plan the next step with you

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp