Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Salmaniyah Second District

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Salmaniyah Second District

Bitumen bathroom waterproofing in Al Salmaniyah Second District begins with photos of the floor and wall bases, sent by call or WhatsApp. The district sits between the First and Third Salmaniyah districts, among closely neighbouring residential areas.

Homes in Al Salmaniyah share similar plot sizes, and its neighbouring districts include small villas and multi-storey blocks. Bathrooms are sometimes arranged in close rows, and leaks usually appear at joints where the floor meets the wall or around the drain opening. The lining stage follows from where the fault is and the condition of the layers, as shown in the photos.

  • Al Salmaniyah Second District is in Hofuf, Al-Ahsa, in the Eastern Province, lying between the First and Third Salmaniyah districts.
  • Most bathroom leaks begin at a small neglected joint rather than across a large area of floor.
What the service includes

What the service covers in Al Salmaniyah Second District

  • Checking the concrete floor and wall bases and identifying cracks
  • Closing the waterproofing around drain openings and pipe entries
  • Confirming full drying before the screed is poured
  • Turning the layer up the walls in the wet zone and sealing the corners
How we work

From first contact to the finished job in Al Salmaniyah Second District

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

We serve Al Salmaniyah Second District and around itIncluding Al Salmaniyah First District, Al Salmaniyah Forth District and Al Salmaniyah Third District, as part of our work across the Eastern Province.

Your request from Al Salmaniyah Second District comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bitumen bathroom waterproofing in Al Salmaniyah Second District

Is the drain joint treated in Al Salmaniyah Second District bathrooms?

Yes, the drain joint is one of the most common leak points. The photos will show whether treating the joint is enough or wider work is needed around it.

Can bitumen waterproofing be done in Al Salmaniyah Second flats?

It can, provided the floor and the layers beneath it allow it. Send photos of the bathroom on WhatsApp and we will confirm with you whether bitumen suits your case.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

How do I request bitumen bathroom waterproofing in Al Salmaniyah Second District?

Call us, or send clear photos of the spot and its location in Al Salmaniyah Second District on WhatsApp, and we will work out the next step with you.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Nearby areas

Bitumen bathroom waterproofing near Al Salmaniyah Second District

Nearby areas we also cover: Al Salmaniyah First District, Al Salmaniyah Forth District and Al Salmaniyah Third District.

Other services in the area

More services in Al Salmaniyah Second District

Pool at night with water jets after waterproofing

In Al Salmaniyah Second District and need bitumen bathroom waterproofing?
Send us photos of the spot

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp