
Bitumen bathroom waterproofing in Al Qashlah
Bitumen bathroom waterproofing in Al Qashlah begins with photos of the floor and lower walls, sent by call or WhatsApp. The district has houses and apartment blocks, where bathrooms need strong waterproofing before tiling to protect the structure from moisture and leaks.
Al Qashlah comprises multi-storey houses and apartment blocks of varying ages. Older bathrooms often show damp around floors and corners, and newer ones need reliable waterproofing before renovation or construction starts. Bitumen forms a lasting barrier against daily water use and leaks from above. Photos show the surface condition and existing cracks to determine the layer thickness and number of coats needed.
- Al Qashlah is a district in the Eastern Province, close to Al Haras Al Watani and Sports City, with houses and apartment blocks.
- Bathrooms in apartment blocks face constant moisture, so bitumen waterproofing must cover both the floor and lower walls together.
What we do for you in Al Qashlah
- Closing the waterproofing around drain openings and pipe entries
- Confirming full drying before the screed is poured
- Cleaning the surface and treating cracks and corners before application
- Checking the concrete floor and wall bases and identifying cracks
How we carry out bitumen bathroom waterproofing in Al Qashlah
Send photos of the bathroom
On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.
Prepare the surface
The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.
Apply the bitumen
Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.
Screed, then tile
Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.
Why Abraj Al Azl?
A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.
Start from Al Qashlah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
Your request from Al Qashlah comes to usCall or WhatsApp on one number, and we answer you ourselves.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
What customers ask in Al Qashlah
Does bitumen prevent water leaking from a bathroom to the flat below?
Yes, bitumen forms a continuous waterproof layer that stops water penetrating the concrete and walls. It must cover the entire floor, bases and corners before tiling to ensure complete protection.
Can an old bathroom be waterproofed before renovation in Al Qashlah?
Yes, the old bathroom is cleaned first and cracks and gaps are repaired, then bitumen is applied. Send photos of the floor and lower walls so we can decide with you whether any damage needs fixing before waterproofing.
Why does bitumen need screed over it before tiling?
Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.
How do I know the bathroom was not properly waterproofed before?
Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.
Does the bathroom need ventilation while bitumen is applied?
Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.
Is Al Qashlah within your service area?
Yes, Al Qashlah is one of the areas we work in, as are Al Haras Al Watani, Sports City (near Al Khobar) and Ar Rakah Ash Shamaliyah. To start, call us or message us on WhatsApp.
Areas near Al Qashlah
We also work near Al Qashlah, in Al Haras Al Watani, Sports City (near Al Khobar) and Ar Rakah Ash Shamaliyah.
More services in Al Qashlah




