Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Qashlah

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Qashlah

Bitumen bathroom waterproofing in Al Qashlah begins with photos of the floor and lower walls, sent by call or WhatsApp. The district has houses and apartment blocks, where bathrooms need strong waterproofing before tiling to protect the structure from moisture and leaks.

Al Qashlah comprises multi-storey houses and apartment blocks of varying ages. Older bathrooms often show damp around floors and corners, and newer ones need reliable waterproofing before renovation or construction starts. Bitumen forms a lasting barrier against daily water use and leaks from above. Photos show the surface condition and existing cracks to determine the layer thickness and number of coats needed.

  • Al Qashlah is a district in the Eastern Province, close to Al Haras Al Watani and Sports City, with houses and apartment blocks.
  • Bathrooms in apartment blocks face constant moisture, so bitumen waterproofing must cover both the floor and lower walls together.
What the service includes

What we do for you in Al Qashlah

  • Closing the waterproofing around drain openings and pipe entries
  • Confirming full drying before the screed is poured
  • Cleaning the surface and treating cracks and corners before application
  • Checking the concrete floor and wall bases and identifying cracks
How we work

How we carry out bitumen bathroom waterproofing in Al Qashlah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Start from Al Qashlah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Your request from Al Qashlah comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Qashlah

Does bitumen prevent water leaking from a bathroom to the flat below?

Yes, bitumen forms a continuous waterproof layer that stops water penetrating the concrete and walls. It must cover the entire floor, bases and corners before tiling to ensure complete protection.

Can an old bathroom be waterproofed before renovation in Al Qashlah?

Yes, the old bathroom is cleaned first and cracks and gaps are repaired, then bitumen is applied. Send photos of the floor and lower walls so we can decide with you whether any damage needs fixing before waterproofing.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Is Al Qashlah within your service area?

Yes, Al Qashlah is one of the areas we work in, as are Al Haras Al Watani, Sports City (near Al Khobar) and Ar Rakah Ash Shamaliyah. To start, call us or message us on WhatsApp.

Nearby areas

Areas near Al Qashlah

We also work near Al Qashlah, in Al Haras Al Watani, Sports City (near Al Khobar) and Ar Rakah Ash Shamaliyah.

Other services in the area

More services in Al Qashlah

Pool at night with water jets after waterproofing

Your first step in Al Qashlah:
a call or a WhatsApp message

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp