Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Majidiyah District

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Majidiyah District

Bitumen bathroom waterproofing in Al Majidiyah District starts with photos of the space, sent by call or WhatsApp. The district contains houses and villas of various ages, where bathroom floors need protection before screed and tiling are laid.

Houses in Al Majidiyah vary greatly in age, from older to newer, with bathrooms that differ in design and construction. An older floor may have settled slightly or collect moisture, while a newer one may need waterproofing before its first layer. Bitumen forms a flexible layer that tolerates minor foundation movement and shields against ground moisture and leaks from pipes. Photos reveal the base condition, cracks and joints to decide the layer thickness and any repairs needed.

  • Al Majidiyah District is a residential district in the Eastern Province, lying close to Ar Rabwah, Al Badriyah and Al Muhandisin districts.
  • A bathroom floor is exposed to water every day, and bitumen must cover corners and joints where water pools most.
What the service includes

What we do for you in Al Majidiyah District

  • Checking the concrete floor and wall bases and identifying cracks
  • Cleaning the surface and treating cracks and corners before application
  • Applying bitumen layers over the floor including the shower area
  • Turning the layer up the walls in the wet zone and sealing the corners
How we work

From first contact to the finished job in Al Majidiyah District

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Your request from Al Majidiyah District comes to usCall or WhatsApp on one number, and we answer you ourselves.

Start from Al Majidiyah District with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bitumen bathroom waterproofing in Al Majidiyah District

Must the whole bathroom be cleared before the bitumen is applied?

It is best to clear the space as much as possible, but the steps depend on the floor's current condition. Send photos showing what is there and we will explain what must be done before waterproofing begins.

Is bitumen alone enough or do we need another layer?

Bitumen provides strong protection, but each case differs depending on moisture and the base. Photos show whether additional treatments are needed to ensure safe, lasting waterproofing.

Is Al Majidiyah District within your service area?

Yes, Al Majidiyah District is one of the areas we work in, as are Ar Rabwah District, Al Badriyah District and Al Muhandisin District. To start, call us or message us on WhatsApp.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Nearby areas

Bitumen bathroom waterproofing near Al Majidiyah District

We also offer bitumen bathroom waterproofing in Ar Rabwah District, Al Badriyah District and Al Muhandisin District, among the closest areas to Al Majidiyah District.

Other services in the area

More services in Al Majidiyah District

Pool at night with water jets after waterproofing

Your first step in Al Majidiyah District:
a call or a WhatsApp message

Describe the problem and where it is in Al Majidiyah District, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp