Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Mahawa

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Mahawa

Bitumen bathroom waterproofing in Al Mahawa begins with WhatsApp messages carrying photos of the floor and walls. This small settlement has a limited number of houses and villas, each with a bathroom that needs effective protection before finishing.

Houses and villas in the settlement are relatively spread out, and bathroom designs and sizes vary. Moisture seeps through cracks and joints in the concrete, especially around pipe entries and the floor. Waterproofing the bathroom with bitumen before screed is poured protects the walls and floor from long-term leaks. Photos show the concrete and pipe condition, helping select the right approach.

  • Al Mahawa is a small settlement in the Eastern Province, near Ash Shayyit and Umm ash Shifallah, with a limited number of houses and villas.
  • Bathrooms in small settlements need strong waterproofing because any leak may go unnoticed for a long time.
What the service includes

The scope of the work in Al Mahawa

  • Turning the layer up the walls in the wet zone and sealing the corners
  • Confirming full drying before the screed is poured
  • Closing the waterproofing around drain openings and pipe entries
  • Cleaning the surface and treating cracks and corners before application
How we work

The stages of the work in Al Mahawa

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Your request from Al Mahawa comes to usCall or WhatsApp on one number, and we answer you ourselves.

We serve Al Mahawa and around itIncluding Ash Shayyit, Umm ash Shifallah and Khubayra', as part of our work across the Eastern Province.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bitumen bathroom waterproofing in Al Mahawa

Can a new villa bathroom in Al Mahawa be waterproofed without a long wait?

Yes, send photos of the bathroom and concrete, and we will set the timeline with you. We start by reviewing the photos, then treat the surface and apply the waterproofing before screed is poured.

What if there is already damp in an old bathroom?

We treat the damp first by cleaning the surface and cracks, then apply the bitumen to prevent new leaks. Photos help us assess the problem and determine what steps are needed.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Do you offer bitumen bathroom waterproofing in Al Mahawa?

Yes. Al Mahawa is within our service area in the Eastern Province, and we also work in Ash Shayyit, Umm ash Shifallah and Khubayra'. Call us or send photos of the spot on WhatsApp.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

Nearby areas

Areas near Al Mahawa

If the site is outside Al Mahawa, the same service is available in Ash Shayyit, Umm ash Shifallah and Khubayra'.

Other services in the area

More services in Al Mahawa

Pool at night with water jets after waterproofing

Bitumen bathroom waterproofing in Al Mahawa?
Call us now

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp