Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Khubrah

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Khubrah

Bitumen bathroom waterproofing in Al Khubrah begins with photos of the bathroom floor and wall bases, sent by call or WhatsApp. Al Khubrah is a small village of scattered houses and farms, so building and plumbing methods vary from one home to the next.

Homes in Al Khubrah usually sit on fairly wide plots, and bathrooms have often been added to existing buildings at different times. In homes like these, damp tends to show at the ground-level wall bases and around drains, and a bathroom built on exposed ground needs particular care at its joints. The photos show how sound the floor is before any treatment is decided.

  • Al Khubrah is a village in Al-Ahsa in the Eastern Province, lying close to As Sarrar, Az Zughayn and Ghanwa.
  • A floor built on exposed ground needs a firm base before the bitumen layer.
What the service includes

What we do for you in Al Khubrah

  • Applying bitumen layers over the floor including the shower area
  • Checking the concrete floor and wall bases and identifying cracks
  • Turning the layer up the walls in the wet zone and sealing the corners
  • Closing the waterproofing around drain openings and pipe entries
How we work

The stages of the work in Al Khubrah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

We serve Al Khubrah and around itIncluding As Sarrar, Az Zughayn and Ghanwa, as part of our work across the Eastern Province.

Bitumen bathroom waterproofing in Al KhubrahWe choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bitumen bathroom waterproofing in Al Khubrah

Are bathrooms added to older houses in Al Khubrah waterproofed?

Yes, provided the floor is firm. The photos show whether the bathroom sits on a level base or needs preparing, and we will tell you the right step before starting.

Does waterproofing differ for ground-level bathrooms from upper-floor ones?

Yes, a ground-level bathroom faces damp from below, so its base and wall bases are examined more closely. Send photos of the site and we will identify what is needed.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Is Al Khubrah within your service area?

Yes, Al Khubrah is one of the areas we work in, as are As Sarrar, Az Zughayn and Ghanwa. To start, call us or message us on WhatsApp.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Nearby areas

Bitumen bathroom waterproofing near Al Khubrah

If the site is outside Al Khubrah, the same service is available in As Sarrar, Az Zughayn and Ghanwa.

Other services in the area

More services in Al Khubrah

Pool at night with water jets after waterproofing

Bitumen bathroom waterproofing in Al Khubrah?
Call us now

Call us or send photos of the floor, the pipe entries and the wall bases on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp