Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Khalidiyah (near Hafar Al-Batin)

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Khalidiyah (near Hafar Al-Batin)

Bitumen bathroom waterproofing in Al Khalidiyah starts with photos of the bathroom floor and wall bases, sent by call or WhatsApp. The district lies near Hafar Al-Batin, Ar Rabwah and Al Baladiyah, and the layers are arranged to suit the floor that is already there.

Al Khalidiyah is a district of mostly single-storey houses and added extensions, and many of its bathrooms have old floors that have been retiled more than once. When retiling is done without lining, water collects under the tiles and later appears at the adjoining walls or ceiling. Tiles are removed where needed, then the floor and bases are lined before retiling. The photos reveal the extent of the damage before any work is decided.

  • Al Khalidiyah is a district of Hafar Al-Batin in the Eastern Province, close to Ar Rabwah and Al Baladiyah, dominated by single-storey houses and extensions.
  • Tiles relaid over an unlined floor hide the damp beneath, which only shows after some time in use.
What the service includes

The scope of the work in Al Khalidiyah (near Hafar Al-Batin)

  • Closing the waterproofing around drain openings and pipe entries
  • Cleaning the surface and treating cracks and corners before application
  • Applying bitumen layers over the floor including the shower area
  • Turning the layer up the walls in the wet zone and sealing the corners
How we work

From first contact to the finished job in Al Khalidiyah (near Hafar Al-Batin)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Your request from Al Khalidiyah (near Hafar Al-Batin) comes to usCall or WhatsApp on one number, and we answer you ourselves.

We serve Al Khalidiyah (near Hafar Al-Batin) and around itIncluding Hafar Al-Batin, Ar Rabwah (near Hafar Al-Batin) and Al Baladiyah, as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bitumen bathroom waterproofing in Al Khalidiyah (near Hafar Al-Batin)

Must old tiles be removed to waterproof a bathroom in Al Khalidiyah?

Not always. If the tiles are firm and not hollow, work may only be needed on the floor and bases at the leak points. The photos will determine this.

Why does a leak in Al Khalidiyah appear after the bathroom is retiled?

Often because the retiling was done without lining underneath, so water stays trapped and finds its way to the adjoining wall over time. We address this by lining the floor and bases and then retiling.

What should I send you from Al Khalidiyah (near Hafar Al-Batin)?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Khalidiyah (near Hafar Al-Batin), and we will work out the next step with you.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Nearby areas

Areas near Al Khalidiyah (near Hafar Al-Batin)

We also offer bitumen bathroom waterproofing in Hafar Al-Batin, Ar Rabwah (near Hafar Al-Batin) and Al Baladiyah, among the closest areas to Al Khalidiyah (near Hafar Al-Batin).

Other services in the area

More services in Al Khalidiyah (near Hafar Al-Batin)

Pool at night with water jets after waterproofing

In Al Khalidiyah (near Hafar Al-Batin) and need bitumen bathroom waterproofing?
Send us photos of the spot

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp