Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Khafji

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Khafji

Bitumen bathroom waterproofing in Al Khafji covers the floor and wall bases before the screed and tiles go down. Send photos of the bathroom by call or WhatsApp, and we will look at the floor, the drain and the wall joints with you before deciding on the method.

Al Khafji has a mix of apartment blocks and detached villas, and many bathrooms sit on upper floors where a screed and tile build-up lies over a concrete slab. In that setup the bitumen layer is applied to the floor and carried up the wall bases, where water often finds its way through. Older bathrooms tend to show damp at the wall bases and cracks near the drain, while newer ones may only need the bases checked before tiling. The photos show which case applies to yours.

  • Al Khafji is a city in the Eastern Province, close to Al Jawharah, Al Luluah and Al Muhammadiyah.
  • Bathroom floors above another room are the ones most often in need of bitumen before tiling.
What the service includes

The main items of bitumen bathroom waterproofing in Al Khafji

  • Cleaning the surface and treating cracks and corners before application
  • Checking the concrete floor and wall bases and identifying cracks
  • Turning the layer up the walls in the wet zone and sealing the corners
  • Closing the waterproofing around drain openings and pipe entries
How we work

The stages of the work in Al Khafji

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

We serve Al Khafji and around itIncluding Al Jawharah (near Al Khafji), Al Luluah and Al Muhammadiyah (near Al Khafji), as part of our work across the Eastern Province.

Al Khafji is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Khafji

Can bitumen go under tiles in an upper-floor bathroom?

It can be applied beneath the screed in an upper-floor bathroom, provided the slab underneath is sound and the drain falls correctly. The photos and a call let us check the slab before we agree a method with you.

Do you check the wall bases before tiling in Al Khafji?

Yes, the wall bases are part of the job, because water often reaches the bathroom through them. Send photos of the joints and the skirting area, and tell us the tiling stage so we can say whether the bitumen should go on now.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Do you cover Al Khafji?

Yes. We serve Al Khafji and nearby areas such as Al Jawharah (near Al Khafji), Al Luluah and Al Muhammadiyah (near Al Khafji), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

Nearby areas

Bitumen bathroom waterproofing near Al Khafji

Nearby areas we also cover: Al Jawharah (near Al Khafji), Al Luluah and Al Muhammadiyah (near Al Khafji).

Other services in the area

More services in Al Khafji

Pool at night with water jets after waterproofing

In Al Khafji and need bitumen bathroom waterproofing?
Send us photos of the spot

Describe the problem and where it is in Al Khafji, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp