Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Jubayl (near Al-Hofuf)

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Jubayl (near Al-Hofuf)

We carry out bitumen bathroom waterproofing in Al Jubayl, starting with photos of the floor and wall bases sent by call or WhatsApp. Bitumen goes on before the screed and tiles, so water is stopped from reaching the structural layers from the start.

Al Jubayl combines an industrial area with residential compounds, villas and flats of varying age, and bathrooms there face coastal humidity that keeps walls damp for long periods. Bitumen is applied to the floor and wall bases before the screed, and the joints around drains are checked, as they are where leaks most often start. The photos determine what each bathroom needs before any method is chosen.

  • Al Jubayl is a district in the Eastern Province, close to At Turbaibil, Ash Shaharin and Al Qarah, combining an industrial zone with housing.
  • Damp in bathrooms most often shows at the base of walls, because water seeps down from the floor beneath the tiles.
What the service includes

The bitumen bathroom waterproofing work in Al Jubayl (near Al-Hofuf)

  • Confirming full drying before the screed is poured
  • Cleaning the surface and treating cracks and corners before application
  • Checking the concrete floor and wall bases and identifying cracks
  • Closing the waterproofing around drain openings and pipe entries
How we work

This is how we work in Al Jubayl (near Al-Hofuf)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Al Jubayl (near Al-Hofuf) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Your request from Al Jubayl (near Al-Hofuf) comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bitumen bathroom waterproofing in Al Jubayl (near Al-Hofuf)

Can bitumen be applied to older flat bathrooms in Al Jubayl?

Often yes, provided the concrete floor is sound and can be cleaned and prepared. If tiles are damaged or the gaps are wide, the photos will show it before any decision is made.

What is checked first in Al Jubayl residential bathrooms?

The joints around the drain, the wall bases and the basin area are checked, since they usually reveal the source of damp. Send photos of these spots on WhatsApp so we know what is needed.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

What should I send you from Al Jubayl (near Al-Hofuf)?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Jubayl (near Al-Hofuf), and we will work out the next step with you.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Nearby areas

Areas near Al Jubayl (near Al-Hofuf)

We also offer bitumen bathroom waterproofing in At Turbaibil, Ash Shaharin and Al Qarah, among the closest areas to Al Jubayl (near Al-Hofuf).

Other services in the area

More services in Al Jubayl (near Al-Hofuf)

Pool at night with water jets after waterproofing

We start with you in Al Jubayl (near Al-Hofuf)
with one call

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp