Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Jarn

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Jarn

Bitumen waterproofing for bathrooms in Al Jarn begins with photos of floors and lower walls sent by phone or WhatsApp. The district has houses and small residential buildings whose bathrooms need protection before interior construction and tiling.

Al Jarn comprises houses and residential units of various sizes and mixed age. Bathrooms are small to medium-sized, prone to damp especially in older houses with aged pipes. Intense heat and seasonal humidity affect concrete and foundations, and damp marks may appear on lower walls. Bitumen provides reliable protection before screed and construction, and photos show the existing condition and whether initial treatment is needed.

  • Al Jarn is a district in Hofuf in the Eastern Province, near Al Qarn, Julayjilah and Al Qurayn, marked by very high temperatures and variable humidity.
  • Older houses show damp marks and wall discolouration in their bathrooms due to poor insulation, so bitumen before new construction is essential.
What the service includes

The bitumen bathroom waterproofing work in Al Jarn

  • Closing the waterproofing around drain openings and pipe entries
  • Confirming full drying before the screed is poured
  • Cleaning the surface and treating cracks and corners before application
  • Checking the concrete floor and wall bases and identifying cracks
How we work

How we carry out bitumen bathroom waterproofing in Al Jarn

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Start from Al Jarn with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Bitumen bathroom waterproofing in Al JarnWe choose the method and the materials once we know the condition of the spot.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bitumen bathroom waterproofing in Al Jarn

Is bitumen enough for a bathroom in an old house in Al Jarn?

If the base concrete is sound, yes. But we examine photos first to see whether there are large cracks or severe damp needing treatment before bitumen.

Do you waterproof bathrooms in small residential units in Al Jarn?

Yes, we serve Al Jarn. Send photos of the bathroom and tell us about any existing damp or wall marks so we can assess and choose the right approach.

Is Al Jarn within your service area?

Yes, Al Jarn is one of the areas we work in, as are Al Qarn, Julayjilah and Al Qurayn. To start, call us or message us on WhatsApp.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Nearby areas

Areas near Al Jarn

Nearby areas we also cover: Al Qarn, Julayjilah and Al Qurayn.

Other services in the area

More services in Al Jarn

Pool at night with water jets after waterproofing

Your first step in Al Jarn:
a call or a WhatsApp message

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp