
Bitumen bathroom waterproofing in Al Jamiyin (near Tarout)
Bitumen waterproofing for bathrooms in Al Jamiyin starts with WhatsApp photos of floors and walls in damp areas. The district has diverse villas and residential buildings with bathrooms in various conditions that need effective waterproofing before screed and tiles.
Al Jamiyin buildings range from modern villas to mid-rise blocks, each bathroom having different circumstances. Daily water and damp affect bathroom floors and walls, with repeated leaks appearing when basic waterproofing is lacking. Bitumen forms a protective layer on floors and walls before construction, working best on a clean surface free of gaps and cracks. Photos determine whether cleaning or repair is needed before bitumen is applied.
- Al Jamiyin is a district in the Eastern Province, close to Al Muruj, Tarout and Al Nakhil, with villas and multi-storey residential buildings.
- Bathrooms that are old or were never waterproofed often cause damp in neighbouring walls and rapid decay of tiles and screed.
The main items of bitumen bathroom waterproofing in Al Jamiyin (near Tarout)
- Checking the concrete floor and wall bases and identifying cracks
- Applying bitumen layers over the floor including the shower area
- Closing the waterproofing around drain openings and pipe entries
- Turning the layer up the walls in the wet zone and sealing the corners
This is how we work in Al Jamiyin (near Tarout)
Send photos of the bathroom
On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.
Prepare the surface
The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.
Apply the bitumen
Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.
Screed, then tile
Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.
Why Abraj Al Azl?
A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.
Al Jamiyin (near Tarout) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
Start from Al Jamiyin (near Tarout) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
Questions about bitumen bathroom waterproofing in Al Jamiyin (near Tarout)
Can a finished bathroom in Al Jamiyin be waterproofed with bitumen without removing screed and tiles?
If screed and tiles are sound, we may treat leaks from inside with other methods. If there are many leaks or visible damage, removing tiles and screed and applying fresh bitumen is the most reliable solution. Send photos of leaks and damage so we can assess your options.
Does bitumen protect against damp coming from outside as well?
Bitumen primarily protects against water from inside and the surface. Damp entering from external walls may need additional treatment on the outside. Photos and location reveal the damp source and the right solution for your situation.
Does the bathroom need ventilation while bitumen is applied?
Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.
Is bitumen right for bathroom walls as well as the floor?
Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.
How do I know the bathroom was not properly waterproofed before?
Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.
What should I send you from Al Jamiyin (near Tarout)?
Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Jamiyin (near Tarout), and we will work out the next step with you.
We also offer it in neighbouring areas
We also work near Al Jamiyin (near Tarout), in Al Muruj (near Tarout), Tarout and Al Nakhil (near Tarout).
More services in Al Jamiyin (near Tarout)




