
Bitumen bathroom waterproofing in Al Husayy
We apply bitumen bathroom waterproofing in Al Husayy, starting from photos of the bathroom floor and wall bases sent by call or WhatsApp. Al Husayy is a small hamlet of standalone houses, where bathrooms face constant water and damp.
Al Husayy is made up largely of standalone houses, each with its own bathroom, and bathrooms vary in age from one to the next. Bitumen goes onto the floor and wall bases before screed and tiles, protecting the layers beneath from water seepage. A bathroom connected to a kitchen or laundry sees more damp, which is why the wall bases are the key point to check. The photos show where the priority lies in your bathroom.
- Al Husayy is a small hamlet in the Eastern Province, close to Utayyiq, Ghanwa and Nita.
- A bathroom serving a laundry or kitchen takes more water than others, so its bases are checked first.
The scope of the work in Al Husayy
- Turning the layer up the walls in the wet zone and sealing the corners
- Confirming full drying before the screed is poured
- Closing the waterproofing around drain openings and pipe entries
- Applying bitumen layers over the floor including the shower area
This is how we work in Al Husayy
Send photos of the bathroom
On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.
Prepare the surface
The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.
Apply the bitumen
Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.
Screed, then tile
Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.
Why Abraj Al Azl?
A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.
Bitumen bathroom waterproofing in Al HusayyWe choose the method and the materials once we know the condition of the spot.
Al Husayy is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
أفضل شركة عزل اسطح الفوم وخزانات المياه
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
Real Google reviews, shown exactly as their authors wrote them.
Before you book bitumen bathroom waterproofing in Al Husayy
Is bitumen enough for a bathroom that also serves a laundry in Al Husayy?
Bitumen treats the floor and wall bases, but a more humid bathroom may need extra work at the joints. The photos will establish exactly what is needed.
Is an older bathroom in Al Husayy checked before lining?
Yes, we check the visible layers in the photos first; if cracks or wear appear, we deal with them before the bitumen goes down so the waterproofing holds.
What should I send you from Al Husayy?
Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Husayy, and we will work out the next step with you.
Why does bitumen need screed over it before tiling?
Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.
Is bitumen right for bathroom walls as well as the floor?
Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.
How do I know the bathroom was not properly waterproofed before?
Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.
More services in Al Husayy




