Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Hada

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Hada

Bitumen bathroom waterproofing in Al Hada begins with photos of the floor and wall bases, sent by call or WhatsApp. We serve Al Hada, a district of the Eastern Province lying close to Al Khobar, Al Andalus and Al Olaya. The method is settled once the photos show the condition of the existing surfaces.

The district has villas and multi-storey residential buildings, and bathrooms are often on upper floors above other rooms. Bitumen on the floor and along the wall bases is therefore an important step in protecting what lies beneath from water seepage. Each bathroom differs in age and in its current tile layers, so the photos show whether the work is limited to repair or needs the full lining renewed.

  • Al Hada is a district in the Eastern Province, lying close to Al Khobar, Al Andalus and Al Olaya.
  • Water from an upper bathroom usually escapes through the floor-to-wall joints, so those points are treated first.
What the service includes

What the service covers in Al Hada

  • Confirming full drying before the screed is poured
  • Applying bitumen layers over the floor including the shower area
  • Turning the layer up the walls in the wet zone and sealing the corners
  • Closing the waterproofing around drain openings and pipe entries
How we work

How we carry out bitumen bathroom waterproofing in Al Hada

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Bitumen bathroom waterproofing in Al HadaWe choose the method and the materials once we know the condition of the spot.

Your request from Al Hada comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bitumen bathroom waterproofing in Al Hada

Must old tiles be removed before bathroom waterproofing in Al Hada?

It depends on whether the existing tiles are firmly bonded and whether the surface beneath is sound. The photos will show the condition, and we will tell you which approach suits your bathroom before any work begins.

Can bitumen be applied to a bathroom on an upper floor?

Yes, the method is commonly used on upper floors, provided the slab is sound and water has not yet leaked into the room below. Send a photo of the ceiling underneath as well, so we can see whether any seepage has started.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

Is Al Hada within your service area?

Yes, Al Hada is one of the areas we work in, as are Al Khobar, Al Andalus (near Al Khobar) and Al Olaya. To start, call us or message us on WhatsApp.

Nearby areas

Bitumen bathroom waterproofing near Al Hada

We also work near Al Hada, in Al Khobar, Al Andalus (near Al Khobar) and Al Olaya.

Other services in the area

More services in Al Hada

Pool at night with water jets after waterproofing

Tell us about your site in Al Hada
and we will plan the next step with you

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp