Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Ghadir

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Ghadir

Bathroom bitumen waterproofing in Al Ghadir starts with a photo of the floor and lower walls sent by WhatsApp or call. Al Ghadir is a residential area with homes of varied character, and each bathroom needs individual assessment before protection is applied.

Al Ghadir mixes older homes with newer ones, so you may find bathrooms with aged floors alongside newly built homes. Older floors may be unstable or have small cavities needing fill before waterproofing, while new ones usually just need cleaning and preparation. Bitumen creates an impermeable layer against seepage, and dryness and good ventilation are essential before work begins. Photos help us understand each bathroom's condition before a waterproofing plan is made.

  • Al Ghadir is a district in the Eastern Province near Al Muntazah, An Noor and Al Naseem, with residences of varied ages.
  • Bathrooms in older homes may have uneven floors requiring extra preparation before bitumen application.
What the service includes

What we do for you in Al Ghadir

  • Turning the layer up the walls in the wet zone and sealing the corners
  • Closing the waterproofing around drain openings and pipe entries
  • Confirming full drying before the screed is poured
  • Cleaning the surface and treating cracks and corners before application
How we work

This is how we work in Al Ghadir

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Start from Al Ghadir with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Al Ghadir is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Ghadir

Must an old bathroom floor be replaced before bitumen waterproofing?

Not necessarily. If the floor is stable, it can be prepared and minor defects corrected before bitumen is applied. Photos help us determine whether replacement is actually needed.

How do we handle bathroom moisture in Al Ghadir before waterproofing?

The floor must be completely dry before bitumen application. If the bathroom is damp, we may need initial ventilation or drying. Tell us about the condition in the photo and during the call.

Do you cover Al Ghadir?

Yes. We serve Al Ghadir and nearby areas such as Al Muntazah (near Sayhat), An Noor (near Sayhat) and Al Naseem, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Nearby areas

We also offer it in neighbouring areas

Nearby areas we also cover: Al Muntazah (near Sayhat), An Noor (near Sayhat) and Al Naseem.

Other services in the area

More services in Al Ghadir

Pool at night with water jets after waterproofing

Your first step in Al Ghadir:
a call or a WhatsApp message

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp