Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Budur

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Budur

Bitumen waterproofing of bathrooms in Al Budur starts with WhatsApp photos of the floor, walls and corners. Al Budur comprises close-set small houses and villas, where bathrooms need strong waterproofing before finishing to ensure damp protection.

Houses and villas in Al Budur were built in different periods, some simple and others more developed. An older bathroom may be tight with an uneven floor, increasing the risk of water pooling and damp. Bitumen is applied after surface cleaning and levelling, protecting concrete from daily seeping water. Photos show the current damp state, cracks and weak corners, helping choose the right method.

  • Al Budur is a district in the Eastern Province, close to Safwa, Al Urubah and Umm as Sahik, with closely spaced houses and villas.
  • Small, tight bathrooms are prone to high damp and water pooling without strong waterproofing.
What the service includes

The main items of bitumen bathroom waterproofing in Al Budur

  • Cleaning the surface and treating cracks and corners before application
  • Turning the layer up the walls in the wet zone and sealing the corners
  • Closing the waterproofing around drain openings and pipe entries
  • Checking the concrete floor and wall bases and identifying cracks
How we work

The stages of the work in Al Budur

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Start from Al Budur with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Bitumen bathroom waterproofing in Al BudurWe choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bitumen bathroom waterproofing in Al Budur

Is one coat of bitumen enough for a bathroom or does it need more?

It depends on the surface condition and existing damp. A sound surface may need one strong coat; a damp or cracked one may need prior treatment. Photos show exactly what your bathroom needs.

Is bitumen safe in a bathroom used by young children?

Yes, bitumen is applied under paint and tiles and does not touch skin or water directly. Once cured, it becomes a barrier between the structure and water only, entirely safe for use.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

What should I send you from Al Budur?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Budur, and we will work out the next step with you.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Nearby areas

Bitumen bathroom waterproofing near Al Budur

Nearby areas we also cover: Safwa, Al Urubah (near Safwa) and Umm as Sahik.

Other services in the area

More services in Al Budur

Pool at night with water jets after waterproofing

We start with you in Al Budur
with one call

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp